Berryville School District Solar

☀ SolarElectric Utility1 MW capacity

90th largest plant in Arkansas · 12726th nationally

Berryville School District Solar is a solar power plant in Arkansas with a nameplate capacity of 1.0 MW. It generates roughly 1.8k MWh per year — enough to power about 174 average U.S. homes.

Its capacity factor of 21% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%21%
Peaking — intermittent or backup
Capacity1 MWnameplate
Annual Generation1.8k MWhEPA eGRID
Capacity Factor21%of theoretical max
Annual CO₂metric tons

Location

Plant NameBerryville School District Solar
OperatorToday's Power, Inc.
CityBerryville
CountyCarroll County
StateArkansas
ZIP72660
Coordinates36.37342, -93.58618

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

HydroelectricWindSolar

Generators (1)

IDTechnologyFuelCapacityStatusOnline
SOLSolar PhotovoltaicSolar1.0 MWOperating2018

Grid context

NERC RegionSERC
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc..

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Carroll County

View all plants in Carroll County →

Explore more