Bridleton Solar

☀ SolarElectric Utility
Capacitynameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameBridleton Solar
OperatorDominion Renewable Energy
CityTbd
CountyHenrico County
StateVirginia
ZIP23231
Coordinates37.46000, -77.27000

Generators (1)

IDTechnologyFuelCapacityStatusOnline
BRIDLSolar PhotovoltaicSolar20.0 MWApproved

Grid context

NERC RegionRFC
Balancing AuthorityPjm Interconnection, Llc

What this means

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.