Enid Lake Hydroelectric Project

💧 HydroelectricIPP Non-CHP
Capacitynameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameEnid Lake Hydroelectric Project
OperatorRye Development
CityEnid
CountyPanola County
StateMississippi
ZIP38927
Coordinates34.15807, -89.90553

Generators (2)

IDTechnologyFuelCapacityStatusOnline
NA1Conventional HydroelectricWater2.5 MWPlanned
NA2Conventional HydroelectricWater2.5 MWPlanned

Grid context

NERC RegionSERC
Balancing AuthorityTennessee Valley Authority

What this means

Hydroelectric plants spin turbines using falling or flowing water — typically from a dam-impounded reservoir. They are dispatchable, long-lived, and emission-free at the point of generation, though large reservoirs can disrupt rivers and ecosystems and methane can be released from flooded vegetation.

Other plants in Panola County

View all plants in Panola County →