Electric generating plantEIA plant no. 50437

French Landing Dam

Type
Conventional Hydroelectric
Nameplate capacity
1.6 MW
Units
1
In service since
1988
Operator
Eagle Creek Renewable Energy, LLC
Location
Belleville, Wayne County, Michigan
Rated 268th largest in Michigan · 12534th of 14,761 in the U.S. · by nameplate

French Landing Dam is a hydroelectric power plant in Michigan with a nameplate capacity of 1.6 MW. It generates roughly 3.1k MWh per year — enough to power about 296 average U.S. homes.

Its capacity factor of 22% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, French Landing Dam could make 14.0k MWh. In 2023 it made 3.1k MWh — the same as running at full power 22 hours in every 100.

Nameplate, full year14.0k MWh1.6 MW × 8,760 hours
Actually generated3.1k MWhEPA eGRID, 2023 · ≈296 homes

Peaking or variableCapacity factor 22%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A hydroelectric plant

1reservoir behind the dam2penstock3turbine + generator4water returns to the river
  1. A dam holds water back, building up height — the “head”.
  2. Water drops through a pipe called a penstock.
  3. It spins a turbine at the bottom, which turns a generator.
  4. The water flows out below the dam and back into the river.

Why the numbers look like this: output depends on how far the water falls and how much of it flows, so a hydro plant's year follows rain and snowmelt — and dam operators can hold water back for the hours when power is worth the most.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

NuclearNatural GasCoalOilHydroelectricSolarBiomassBattery Storage

Location

Address12100 Haggerty Road
CityBelleville
CountyWayne County
StateMichigan
ZIP48111
Coordinates42.21426, -83.44069
OperatorEagle Creek Renewable Energy, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
FRL1Conventional HydroelectricWater1.6 MWOperating1988

Ownership

OwnerLocationShare
STS Hydropower, LLCBethesda, MD10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionRFC
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc..

About Hydroelectric plants

Hydroelectric plants spin turbines using falling or flowing water — typically from a dam-impounded reservoir. They are dispatchable, long-lived, and emission-free at the point of generation, though large reservoirs can disrupt rivers and ecosystems and methane can be released from flooded vegetation.

Other plants in Wayne County

View all plants in Wayne County →

Data centers near French Landing Dam

Data centerOperatorDistance
US Signal data center, RomulusUS Signal1.5 mi
Comcast data center, SouthgateComcast12.4 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more