Electric generating plantEIA plant no. 59317

Hecate Energy Beacon Solar 4

Type
Solar Photovoltaic
Nameplate capacity
50.0 MW
Units
1
In service since
2016
Operator
AES Distributed Energy
Location
Cantil, Kern County, California
Rated 431st largest in California · 3933rd of 14,761 in the U.S. · by nameplate

Hecate Energy Beacon Solar 4 is a solar power plant in California with a nameplate capacity of 50.0 MW. It generates roughly 116.3k MWh per year — enough to power about 11,080 average U.S. homes.

Its capacity factor of 27% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Hecate Energy Beacon Solar 4 could make 438.0k MWh. In 2023 it made 116.3k MWh — the same as running at full power 27 hours in every 100.

Nameplate, full year438.0k MWh50.0 MW × 8,760 hours
Actually generated116.3k MWhEPA eGRID, 2023 · ≈11,080 homes

Peaking or variableCapacity factor 27%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

WindSolarBattery Storage

Location

Address29956 Highway 14
CityCantil
CountyKern County
StateCalifornia
ZIP93519
Coordinates35.25361, -118.02694
OperatorAES Distributed Energy

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
BEAC4Solar PhotovoltaicSolar50.0 MWOperating2016

Grid context

NERC RegionWECC
Balancing AuthorityLos Angeles Department of Water and Power

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Kern County

View all plants in Kern County →

Explore more