Hybrid Holdings 1 Capistrano

🔋 Battery StorageIPP Non-CHP
Capacitynameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameHybrid Holdings 1 Capistrano
OperatorElectrodes
CitySan Juan Capistrano
CountyOrange County
StateCalifornia
ZIP92675
Coordinates33.51164, -117.66123

Generators (1)

IDTechnologyFuelCapacityStatusOnline
HH4MWBatteriesBattery4.0 MWCancelled

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

What this means

Battery storage facilities don't generate electricity — they store it. They charge from the grid (often from solar during the day) and discharge during peak demand or to firm up renewables. EIA classifies them as power plants because they connect to the grid like one.

Other plants in Orange County

View all plants in Orange County →