Kettering Solar 2 is a solar power plant in California with a nameplate capacity of 1.0 MW. It generates roughly 1.6k MWh per year — enough to power about 157 average U.S. homes.

Its capacity factor of 19% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%19%
Peaking — intermittent or backup
Capacity1 MWnameplate
Annual Generation1.6k MWhEPA eGRID
Capacity Factor19%of theoretical max
Annual CO₂metric tons

Location

Plant NameKettering Solar 2
OperatorTesla Inc.
CityLancaster
CountyLos Angeles County
StateCalifornia
ZIP93534
Coordinates34.70028, -118.12361

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

WindSolar

Generators (1)

IDTechnologyFuelCapacityStatusOnline
PV1Solar PhotovoltaicSolar1.0 MWOperating2014

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator