Lazy U Solar 2

☀ SolarIPP Non-CHP
Capacitynameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameLazy U Solar 2
OperatorLazy U Solar 2 Llc
CityTbd
CountyHardeman County
StateTexas
ZIP79252
Coordinates34.26550, -99.87214

Generators (1)

IDTechnologyFuelCapacityStatusOnline
LUPV2Solar PhotovoltaicSolar250 MWPlanned

Grid context

NERC RegionTRE
Balancing AuthorityElectric Reliability Council Of Texas, Inc.

What this means

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.