Lowell L&d Hydroelectric Project

💧 HydroelectricIPP Non-CHP
Capacitynameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameLowell L&d Hydroelectric Project
OperatorRye Development
CityAdams Township
CountyWashington County
StateOhio
ZIP45744
Coordinates39.52831, -81.51705

Generators (2)

IDTechnologyFuelCapacityStatusOnline
NA1Conventional HydroelectricWater2.5 MWCancelled
NA2Conventional HydroelectricWater2.5 MWCancelled

Grid context

NERC RegionRFC
Balancing AuthorityPjm Interconnection, Llc

What this means

Hydroelectric plants spin turbines using falling or flowing water — typically from a dam-impounded reservoir. They are dispatchable, long-lived, and emission-free at the point of generation, though large reservoirs can disrupt rivers and ecosystems and methane can be released from flooded vegetation.