Maxwell L&d Hydroelectric Project

💧 HydroelectricIPP Non-CHP
Capacitynameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameMaxwell L&d Hydroelectric Project
OperatorRye Development
CityLuzerne
CountyFayette County
StatePennsylvania
ZIP15433
Coordinates40.00240, -79.95883

Generators (2)

IDTechnologyFuelCapacityStatusOnline
NA1Conventional HydroelectricWater6.0 MWPlanned
NA2Conventional HydroelectricWater6.0 MWPlanned

Grid context

NERC RegionRFC
Balancing AuthorityPjm Interconnection, Llc

What this means

Hydroelectric plants spin turbines using falling or flowing water — typically from a dam-impounded reservoir. They are dispatchable, long-lived, and emission-free at the point of generation, though large reservoirs can disrupt rivers and ecosystems and methane can be released from flooded vegetation.

Other plants in Fayette County

View all plants in Fayette County →