Montgomery L&d Hydroelectric Project

💧 HydroelectricIPP Non-CHP
Capacitynameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameMontgomery L&d Hydroelectric Project
OperatorRye Development
CityMonaca
CountyBeaver County
StatePennsylvania
ZIP15052
Coordinates40.65248, -80.38687

Generators (4)

IDTechnologyFuelCapacityStatusOnline
NA4Conventional HydroelectricWater9.5 MWCancelled
NA1Conventional HydroelectricWater6.8 MWPlanned
NA2Conventional HydroelectricWater6.8 MWPlanned
NA3Conventional HydroelectricWater6.8 MWPlanned

Grid context

NERC RegionRFC
Balancing AuthorityPjm Interconnection, Llc

What this means

Hydroelectric plants spin turbines using falling or flowing water — typically from a dam-impounded reservoir. They are dispatchable, long-lived, and emission-free at the point of generation, though large reservoirs can disrupt rivers and ecosystems and methane can be released from flooded vegetation.

Other plants in Beaver County

View all plants in Beaver County →