Mount Vernon Solar is a solar power plant in Georgia with a nameplate capacity of 1.0 MW. It generates roughly 1.8k MWh per year — enough to power about 168 average U.S. homes.
Its capacity factor of 20% reflects intermittent or peaking operation.
Run flat out every hour of the year, Mount Vernon Solar could make 8.8k MWh. In 2023 it made 1.8k MWh — the same as running at full power 20 hours in every 100.
Peaking or variableCapacity factor 20%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 840 US Hgwy 78 |
|---|---|
| City | Monroe |
| County | Walton County |
| State | Georgia |
| ZIP | 30655 |
| Coordinates | 33.83880, -83.63800 |
| Operator | Walton Electric Member Corp |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| MV01 | Solar Photovoltaic | Solar | 1.0 MW | Operating | 2015 |
| NERC Region | SERC |
|---|---|
| Balancing Authority | Southern Company Services, Inc. - Trans |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.
| Data center | Distance |
|---|---|
| Meta data center, Social Circle | 16.8 mi |
| Meta Stanton Springs Data Center | 16.9 mi |
| Meta data center, Social Circle | 16.9 mi |
| Meta data center, Rutledge | 17.0 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map