Electric generating plantEIA plant no. 57724

NJMC Landfill

Type
Solar Photovoltaic
Nameplate capacity
2.5 MW
Units
1
In service since
2011
Operator
Public Service Elec & Gas Co
Location
Kearny, Hudson County, New Jersey
Rated 234th largest in New Jersey · 10573rd of 14,761 in the U.S. · by nameplate

NJMC Landfill is a solar power plant in New Jersey with a nameplate capacity of 2.5 MW. It generates roughly 3.8k MWh per year — enough to power about 364 average U.S. homes.

Its capacity factor of 17% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, NJMC Landfill could make 21.9k MWh. In 2023 it made 3.8k MWh — the same as running at full power 17 hours in every 100.

Nameplate, full year21.9k MWh2.5 MW × 8,760 hours
Actually generated3.8k MWhEPA eGRID, 2023 · ≈364 homes

Peaking or variableCapacity factor 17%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBiomass

Location

Address932 Bellville Turnpike NJMC 1A
CityKearny
CountyHudson County
StateNew Jersey
ZIP07032
Coordinates40.75083, -74.11000
OperatorPublic Service Elec & Gas Co

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
NJMCSolar PhotovoltaicSolar2.5 MWOperating2011

Grid context

NERC RegionRFC
Balancing AuthorityPJM Interconnection, LLC

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Hudson County

View all plants in Hudson County →

Data centers near NJMC Landfill

Data centerOperatorDistance
Equinix New York Secaucus NY2Equinix2.5 mi
Equinix Secaucus NY6Equinix2.7 mi
Equinix NY3Equinix2.7 mi
Equinix New York Secaucus NY5Equinix2.8 mi
Equinix New York Secaucus NY4Equinix2.8 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more