Nottingham Solar

☀ SolarIPP Non-CHP
Capacitynameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameNottingham Solar
OperatorBq Energy Development
CityCadiz
CountyHarrison County
StateOhio
ZIP43907
Coordinates40.35172, -80.67036

Generators (1)

IDTechnologyFuelCapacityStatusOnline
NOTTSolar PhotovoltaicSolar100 MWPlanned

Grid context

NERC RegionNPCC
Balancing AuthorityPjm Interconnection, Llc

What this means

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.