Electric generating plantEIA plant no. 60038

Owens Corning Headquarters

Type
Solar Photovoltaic
Nameplate capacity
2.1 MW
Units
1
In service since
2015
Operator
Luminace Solar Holding, LLC
Location
Toledo, Lucas County, Ohio
Rated 184th largest in Ohio · 11053rd of 14,761 in the U.S. · by nameplate

Owens Corning Headquarters is a solar power plant in Ohio with a nameplate capacity of 2.1 MW. It generates roughly 1.4k MWh per year — enough to power about 135 average U.S. homes.

Its capacity factor of 8% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Owens Corning Headquarters could make 18.4k MWh. In 2023 it made 1.4k MWh — the same as running at full power 8 hours in every 100.

Nameplate, full year18.4k MWh2.1 MW × 8,760 hours
Actually generated1.4k MWhEPA eGRID, 2023 · ≈135 homes

Peaking or variableCapacity factor 8%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

NuclearNatural GasCoalOilWindSolarBiomass

Location

AddressOne Owens Corning Parkway
CityToledo
CountyLucas County
StateOhio
ZIP43659
Coordinates41.64470, -83.53640
OperatorLuminace Solar Holding, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
PV1Solar PhotovoltaicSolar2.1 MWOperating2015

Grid context

NERC RegionRFC
Balancing AuthorityPJM Interconnection, LLC

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Lucas County

View all plants in Lucas County →

Data centers near Owens Corning Headquarters

Data centerOperatorDistance
Data center, SamariaNot recorded12.2 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more