Rokeby L&d Hydroelectric Project

💧 HydroelectricIPP Non-CHP
Capacitynameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameRokeby L&d Hydroelectric Project
OperatorRye Development
CityBloom Township
CountyMorgan County
StateOhio
ZIP43756
Coordinates39.73200, -81.90930

Generators (2)

IDTechnologyFuelCapacityStatusOnline
NA1Conventional HydroelectricWater2.0 MWCancelled
NA2Conventional HydroelectricWater2.0 MWCancelled

Grid context

NERC RegionRFC
Balancing AuthorityPjm Interconnection, Llc

What this means

Hydroelectric plants spin turbines using falling or flowing water — typically from a dam-impounded reservoir. They are dispatchable, long-lived, and emission-free at the point of generation, though large reservoirs can disrupt rivers and ecosystems and methane can be released from flooded vegetation.

Other plants in Morgan County

View all plants in Morgan County →