Sandhill Solar 2 is a solar power plant in Georgia.
| Plant Name | Sandhill Solar 2 |
|---|---|
| Operator | Leeward Asset Management, Llc |
| City | Butler |
| County | Taylor County |
| State | Georgia |
| ZIP | 31006 |
| Coordinates | 32.58614, -84.33523 |
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| ID | Technology | Fuel | Capacity | Status | Online |
|---|---|---|---|---|---|
| SAHS0 | Solar Photovoltaic | Solar | 200 MW | Planned | — |
| NERC Region | SERC |
|---|---|
| Balancing Authority | Duke Energy Carolinas |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.