Shenvalee Solar

☀ SolarIPP Non-CHP
Capacitynameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameShenvalee Solar
OperatorAntares Group Inc
CityStuarts Draft
CountyAugusta County
StateVirginia
ZIP24477
Coordinates38.02490, -79.03350

Generators (1)

IDTechnologyFuelCapacityStatusOnline
SVSolar PhotovoltaicSolar3.0 MWPlanned

Ownership

OwnerLocationShare
Shenvalee Solar, LlcBristol, VA10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionSERC
Balancing AuthorityPjm Interconnection, Llc

What this means

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Augusta County

View all plants in Augusta County →