Solar Photovoltaic Project #35 is a solar power plant in California.
| Plant Name | Solar Photovoltaic Project #35 |
|---|---|
| Operator | Southern California Edison Co |
| City | Delano |
| County | Kern County |
| State | California |
| ZIP | 93215 |
| Coordinates | 35.74360, -119.22360 |
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| ID | Technology | Fuel | Capacity | Status | Online |
|---|---|---|---|---|---|
| 35H | Solar Photovoltaic | Solar | 0.5 MW | Cancelled | — |
| 35I | Solar Photovoltaic | Solar | 0.5 MW | Cancelled | — |
| 35J | Solar Photovoltaic | Solar | 0.5 MW | Cancelled | — |
| 35K | Solar Photovoltaic | Solar | 0.5 MW | Cancelled | — |
| 35L | Solar Photovoltaic | Solar | 0.5 MW | Cancelled | — |
| 35M | Solar Photovoltaic | Solar | 0.5 MW | Cancelled | — |
| 35N | Solar Photovoltaic | Solar | 0.5 MW | Cancelled | — |
| S35A | Solar Photovoltaic | Solar | 0.5 MW | Cancelled | — |
| S35B | Solar Photovoltaic | Solar | 0.5 MW | Cancelled | — |
| S35C | Solar Photovoltaic | Solar | 0.5 MW | Cancelled | — |
| S35D | Solar Photovoltaic | Solar | 0.5 MW | Cancelled | — |
| S35E | Solar Photovoltaic | Solar | 0.5 MW | Cancelled | — |
| S35F | Solar Photovoltaic | Solar | 0.5 MW | Cancelled | — |
| S35G | Solar Photovoltaic | Solar | 0.5 MW | Cancelled | — |
| NERC Region | WECC |
|---|---|
| Balancing Authority | California Independent System Operator |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.