Talladega County, Alabama has 3 power plants totaling 253 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.
| Plant | City | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| Logan Martin Dam | Vincent | Hydroelectric | 128 MW | Alabama Power Co |
| AMEA Peaking | Sylacauga | Natural Gas | 98.6 MW | Alabama Municipal Elec Authority - (AL) |
| U S Alliance Coosa Pines | Coosa Pines | Biomass | 25.9 MW | Bowater Newport Coosa Pines Op |
Talladega County, Alabama has 3 power plants totaling 253 MW of nameplate capacity. Hydroelectric is the dominant fuel source at 51% of installed capacity, followed by Natural Gas (39%) and Biomass (10%). The largest facility is Logan Martin Dam at 128 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.
To find plants closer to a specific address in Talladega County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.