1,399 data centers are mapped in the U.S. on OpenStreetMap: 1,831 buildings covering about 5,393 acres of roof in 46 states, D.C. and Puerto Rico. One county, Loudoun County, VA, holds 232 of them. Every site below is matched to the grid that powers it: what that grid burns, how much carbon each megawatt-hour carries, and which utilities serve the county.
Find the data centers near an address →
Data centerUnder construction
A data center doesn't run on the power plant down the road. It buys power from a utility and draws it off the regional grid, where electricity from every plant on the system mixes together. So the honest answer to "what powers it" is the grid region's mix. That's how EPA answers the same question for a home or a business, and it's what each page here shows.
Where a data center is built changes how much carbon its electricity carries. Here are the grid regions that hold the most mapped data centers, by pounds of CO₂ per megawatt-hour generated in 2023 (U.S. average 765 lb):
Bar = CO₂ per MWh generated in the region; the number after it is how many mapped data centers sit in that region. Green is cleaner than the U.S. average, dark is dirtier.
| County | Sites | Roof area |
|---|---|---|
| Loudoun County, VA | 232 | 778 ac |
| Prince William County, VA | 68 | 247 ac |
| Santa Clara County, CA | 65 | 120 ac |
| Maricopa County, AZ | 58 | 238 ac |
| Cook County, IL | 35 | 119 ac |
| Bexar County, TX | 34 | 116 ac |
| Fairfax County, VA | 30 | 62 ac |
| Washington County, OR | 26 | 93 ac |
| Dallas County, TX | 25 | 82 ac |
| Licking County, OH | 24 | 161 ac |
| Clark County, NV | 22 | 64 ac |
| DuPage County, IL | 20 | 68 ac |
| Henrico County, VA | 19 | 107 ac |
| Fulton County, GA | 19 | 59 ac |
| Franklin County, OH | 18 | 110 ac |
| King County, WA | 15 | 22 ac |
| Collin County, TX | 14 | 39 ac |
| Travis County, TX | 14 | 31 ac |
| Hudson County, NJ | 13 | 46 ac |
| Polk County, IA | 12 | 129 ac |
| Grant County, WA | 12 | 101 ac |
| Salt Lake County, UT | 12 | 20 ac |
| Middlesex County, NJ | 11 | 53 ac |
| Somerset County, NJ | 11 | 29 ac |
| Douglas County, GA | 10 | 90 ac |
| Operator | Sites | Roof area |
|---|---|---|
| Amazon Web Services | 170 | 842 ac |
| Digital Realty | 81 | 327 ac |
| Quality Technology Services | 47 | 224 ac |
| Equinix | 46 | 110 ac |
| CyrusOne | 43 | 149 ac |
| Flexential | 43 | 73 ac |
| Microsoft | 41 | 306 ac |
| 39 | 358 ac | |
| Meta | 29 | 653 ac |
| DataBank | 22 | 36 ac |
| NTT | 21 | 92 ac |
| CoreSite | 20 | 30 ac |
| Lumen Technologies | 20 | 12 ac |
| Switch | 20 | 118 ac |
| Stack Infrastructure | 18 | 78 ac |
| Centersquare | 16 | 47 ac |
| TierPoint | 15 | 15 ac |
| Vantage Data Centers | 15 | 49 ac |
| Iron Mountain | 13 | 30 ac |
| CloudHQ | 12 | 77 ac |
| Sabey Data Centers | 12 | 35 ac |
| DartPoints | 11 | 0.6 ac |
| EdgeConneX | 11 | 34 ac |
| Aligned | 10 | 44 ac |
| Verizon | 9 | 10 ac |
| CenturyLink | 7 | 4.7 ac |
| Cologix | 7 | 14 ac |
| Stream | 7 | 24 ac |
| Vantage | 7 | 32 ac |
| Csquare | 5 | 15 ac |
Footprint is the area of the buildings as drawn on OpenStreetMap, a proxy for size; operators rarely publish power figures.
| Data center | Place | Roof area |
|---|---|---|
| Data center, Sharon | Sharon, Mississippi | 9.8 ac |
| Data center, Sharon | Sharon, Mississippi | 9.8 ac |
| Amazon Web Services data center, Manassas | Manassas, Virginia | 8.4 ac |
| CloudHQ LC8 | Ashburn, Virginia | 6.4 ac |
| CloudHQ LC14 | Dulles, Virginia | 6.4 ac |
| EdgeConneX Data Center | Elk Grove Village, Illinois | 5.9 ac |
| RIC2 DC6 | Sandston, Virginia | 5.8 ac |
| Microsoft EAT04 | East Wenatchee, Washington | 5.4 ac |
| CloudHQ LC11 | Ashburn, Virginia | 5.2 ac |
| RIC3 DC3 | Sandston, Virginia | 5.2 ac |
| RIC3 DC4 | Sandston, Virginia | 5.2 ac |
| RIC3 DC5 | Sandston, Virginia | 5.2 ac |
| RIC3 DC2 | Sandston, Virginia | 5.2 ac |
| RIC3 DC1 | Sandston, Virginia | 5.2 ac |
| Data center, Sharon | Sharon, Mississippi | 5.0 ac |
| Stream Data Centers data center, Elk Grove Village | Elk Grove Village, Illinois | 3.7 ac |
| Corscale Gainesville - Building 3 | Gainesville, Virginia | 3.6 ac |
| Microsoft CHI13 Data Center | Elk Grove Village, Illinois | 3.4 ac |
| Data center, Bristow | Bristow, Virginia | 3.2 ac |
| CloudHQ LC12 | Ashburn, Virginia | 3.2 ac |
| AWS IAD111 | Manassas, Virginia | 3.1 ac |
| PowerHouse Pacific Building 2 | Sterling, Virginia | 2.9 ac |
| PowerHouse Pacific Building 3 | Sterling, Virginia | 2.9 ac |
| PowerHouse Pacific Building 1 | Sterling, Virginia | 2.9 ac |
| NTT VA8 | Ashburn, Virginia | 2.7 ac |
| CloudHQ LC5 | Dulles, Virginia | 2.6 ac |
| Cologix ASH2 | Ashburn, Virginia | 1.9 ac |
| QTS Data Center - Hillsboro 3 | Hillsboro, Oregon | — |
| Argo Data Center | Afton, Texas | — |
| Crane DC - Portland | Forest Grove, Oregon | — |
| Percheron DC | Boardman, Oregon | — |
| DFW2-DC1 Project | Wilmer, Texas | — |
| Data center, Lancaster | Lancaster, Texas | — |
Sites mappers have tagged as being built. Many new campuses are not mapped yet.
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.