Data Centers in Montana

3 data centers mapped in Montana: 3 buildings covering about 1 acres of roof. Most sit in EPA's Northwest grid region, whose electricity is 39% hydroelectric, 25% natural gas and 16% coal, at 631 lb of CO₂ per megawatt-hour, 18% cleaner than the U.S. grid as a whole (765 lb).

Sites3mapped data centers
Buildings3mapped footprints
Roof area0.2 acbuilding footprints
Counties3with a data center

Map of data centers in Montana

Data centerUnder construction

What powers Montana's data centers

A data center draws from its regional grid, not from one plant. These are the grid regions Montana's data centers sit in, and what those regions generate:

Northwest · 2 sites

631 lb CO₂ per MWh, 18% cleaner than the U.S. grid as a whole (765 lb).

Hydroelectric 39%Natural Gas 25%Coal 16%Wind 12%Solar 3%Nuclear 3%

Share of electricity generated in EPA's Northwest grid region (NWPP) in 2023, from eGRID. 269 TWh from 808 plants.

Upper Midwest · 1 site

920 lb CO₂ per MWh, 20% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Wind 38%Coal 35%Natural Gas 13%Nuclear 8%Hydroelectric 4%

Share of electricity generated in EPA's Upper Midwest grid region (MROW) in 2023, from eGRID. 241 TWh from 1,363 plants.

All power plants in Montana →

By county

Every mapped data center in Montana

Data centerOperatorCity · CountyRoof area
State of Montana Data CenterState of MontanaMiles City · Custer0.2 ac
Data center, PhilipsburgOperator not recordedPhilipsburg · Granite0.0 ac
Parsec Data ManagementOperator not recordedBillings · Yellowstone—

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.