Cologix Data Centers

7 Cologix data centers are mapped in the U.S. on OpenStreetMap, in 4 states: 7 buildings covering about 13.6 acres (591,000 sq ft) of roof. Weighted by building size, the grids they sit on average 710 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).

Sites7mapped
States4with a site
Buildings7mapped footprints
Roof area14 acbuilding footprints

Map of Cologix data centers

Data centerUnder construction

By grid region

Grid regionSitesCO₂ lb/MWhLargest sources
Ohio Valley391138% natural gas, 28% nuclear and 25% coal
Mid-Atlantic259454% natural gas, 36% nuclear and 5% coal
California142643% natural gas, 20% solar and 14% hydroelectric
Florida178275% natural gas, 12% nuclear and 5% solar

Every mapped site

Data centerPlaceGrid regionRoof area
Cologix Santa Clara SV1 Data CenterSanta Clara, CaliforniaCalifornia1.8 ac
Cologix Jacksonville JAX1Jacksonville, FloridaFlorida0.7 ac
Cologix COL2Columbus, OhioOhio Valley2.3 ac
Cologix COL4Columbus, OhioOhio Valley2.0 ac
Cologix COL1Columbus, OhioOhio Valley1.3 ac
Cologix ASH1Ashburn, VirginiaMid-Atlantic3.6 ac
Cologix ASH2 under constructionAshburn, VirginiaMid-Atlantic1.9 ac

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.