Cologix COL4 is a data center in Columbus, Franklin County, Ohio. It is mapped as 1 building covering about 2.0 acres (86,000 sq ft). Its power comes off the Ohio Valley grid (PJM Interconnection), which runs on 38% natural gas, 28% nuclear and 25% coal.
This data centerOther data centersPower plants (colored by fuel)
| Address | 7500 Alta View Boulevard, Columbus OH 43085 |
|---|---|
| County | Franklin County, Ohio |
| Coordinates | 40.11832, -82.99966 |
| On OpenStreetMap | way/1567781259 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Ohio Valley grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 38% natural gas, 28% nuclear, 25% coal and 5% wind.
Each megawatt-hour carried about 911 lb of CO₂, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Ohio Valley grid region (RFCW) in 2023, from eGRID. 524 TWh from 824 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Ohio Power Co | 16.5¢ | 15.2¢ |
| Ohio Edison Co | 17.2¢ | 13.2¢ |
| Duke Energy Ohio Inc | 11.6¢ | 8.7¢ |
| South Central Power Company | 13.6¢ | 10.8¢ |
| Licking Rural Electric Inc | 17.5¢ | 13.4¢ |
| City of Columbus - (OH) | 13.8¢ | 10.3¢ |
| Consolidated Cooperative | 14.8¢ | 11.6¢ |
| City of Westerville - (OH) | 12.0¢ | 9.6¢ |
Utilities that report serving Franklin County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| PS ST-8 Engine No 1 | Oil | 2.0 MW | 11.2 mi |
| 3100 Valleyview Drive | Solar | 1.0 MW | 11.3 mi |
| Dodge Park Engine No 1 | Oil | 2.0 MW | 11.5 mi |
| ST-1/1A Engine No 1 | Oil | 1.3 MW | 11.7 mi |
| Vertiv Solar | Solar | 1.1 MW | 12.5 mi |
| Renick Run Pumping Station 03-04 | Oil | 2.8 MW | 13.1 mi |
| Jackson Pike WWTP Cogen Engines | Biomass | 2.8 MW | 14.3 mi |
| Tosoh SMD | Natural Gas | 3.5 MW | 16.0 mi |
| Igs Cmh4, LLC | Solar | 4.2 MW | 20.7 mi |
| Prospect Municipal | Oil | 1.8 MW | 24.4 mi |
The largest power plant within 50 miles is Fox Squirrel Solar, a 577 MW solar plant 31 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| Cologix COL2 | 2.3 ac | 0.2 mi |
| Cologix COL1 | 1.3 ac | 0.2 mi |
Data centers in Ohio · Data centers in Franklin County · All Cologix data centers · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.