Electric generating plantEIA plant no. 56421

PS ST-8 Engine No 1

Type
Petroleum Liquids
Nameplate capacity
2.0 MW
Units
1
In service since
2008
Operator
City of Columbus - (OH)
Location
Columbus, Franklin County, Ohio
Rated 186th largest in Ohio · 11103rd of 14,761 in the U.S. · by nameplate

PS ST-8 Engine No 1 is a oil power plant in Ohio with a nameplate capacity of 2.0 MW. It generates roughly 3 MWh per year — enough to power about 0 average U.S. homes.

Its capacity factor of 0% reflects intermittent or peaking operation. At 6533 lb CO₂/MWh, its emission rate sits above the national grid average of roughly 800 lb/MWh.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, PS ST-8 Engine No 1 could make 17.5k MWh. In 2023 it made 3 MWh — the same as running at full power less than 1 hours in every 100.

Nameplate, full year17.5k MWh2.0 MW × 8,760 hours
Actually generated3 MWhEPA eGRID, 2023 · ≈0 homes

Peaking or variableCapacity factor 0%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A reciprocating-engine plant

oil1pistons fire like a car engine2generator
  1. oil burns in cylinders, driving pistons — the same principle as a truck engine, much larger.
  2. The crankshaft turns a generator.
  3. Plants are built from several identical engines, so they can run one at a time or all together.

Why the numbers look like this: engines start in minutes and come in small blocks, so they show up at landfills, on islands and as backup or peaking units — places that need power in small, fast pieces.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilSolarBiomass

Location

Address1900 W Broad St
CityColumbus
CountyFranklin County
StateOhio
ZIP43223
Coordinates39.96142, -83.04907
OperatorCity of Columbus - (OH)

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
0005Petroleum LiquidsDistillate Oil2.0 MWStandby2008

Emissions (annual)

CO₂10 metric tons
CO₂ Rate6533 lb/MWh
U.S. grid average800 lb/MWhNatural gas combined-cycle average900 lb/MWhCoal plant average2,100 lb/MWhThis plant6,533 lb/MWh

Annual totals and CO₂ rate reported by EPA eGRID for 2023. Reference averages are approximate U.S.-wide figures from the same dataset.

Grid context

NERC RegionRFC
Balancing AuthorityPJM Interconnection, LLC

About Oil plants

Oil-fired plants typically run only during peak demand or grid emergencies because oil is expensive compared to gas and coal. Per megawatt-hour, they emit nearly as much CO₂ as coal.

Other plants in Franklin County

View all plants in Franklin County →

Data centers near PS ST-8 Engine No 1

Data centerOperatorDistance
Amazon Web Services data center, HilliardAmazon Web Services5.7 mi
Data center, HilliardNot recorded5.7 mi
Oppidan data center, HilliardOppidan7.5 mi
Google data center, LockbourneGoogle8.1 mi
Amazon Web Services data center, HilliardAmazon Web Services8.2 mi
Amazon AWS: Hilliard Data CenterAmazon Web Services us-east-2 datacenter8.2 mi
Google Lockbourne, OHGoogle8.3 mi
Amazon Web Services data center, AmlinAmazon Web Services9.1 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more