Amazon AWS: Hilliard Data Center

Amazon AWS: Hilliard Data Center is a data center run by Amazon Web Services us-east-2 datacenter in Hilliard, Franklin County, Ohio. Its power comes off the Ohio Valley grid (PJM Interconnection), which runs on 38% natural gas, 28% nuclear and 25% coal.

OperatorAmazon Web Services us-east-2 datacenteras mapped
Grid CO₂911 lbper MWh, RFCW region
Nearest plant8.2 miPS ST-8 Engine No 1

Location

This data centerOther data centersPower plants (colored by fuel)

CountyFranklin County, Ohio
Coordinates40.06060, -83.13547
On OpenStreetMapway/460067225

What powers Amazon AWS: Hilliard Data Center

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Ohio Valley grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 38% natural gas, 28% nuclear, 25% coal and 5% wind.

Each megawatt-hour carried about 911 lb of CO₂, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Natural Gas 38%Nuclear 28%Coal 25%Wind 5%

Share of electricity generated in EPA's Ohio Valley grid region (RFCW) in 2023, from eGRID. 524 TWh from 824 plants.

Utilities that serve Franklin County

UtilityTypeGridBusiness rateIndustrial rate
Ohio Power CoInvestor OwnedPJM Interconnection16.5¢15.2¢
Ohio Edison CoInvestor OwnedPJM Interconnection17.2¢13.2¢
Duke Energy Ohio IncInvestor OwnedPJM Interconnection11.6¢8.7¢
South Central Power CompanyCooperativePJM Interconnection13.6¢10.8¢
Licking Rural Electric IncCooperativePJM Interconnection17.5¢13.4¢
City of Columbus - (OH)MunicipalPJM Interconnection13.8¢10.3¢
Consolidated CooperativeCooperativePJM Interconnection14.8¢11.6¢
City of Westerville - (OH)MunicipalPJM Interconnection12.0¢9.6¢

Utilities that report serving Franklin County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
PS ST-8 Engine No 1Oil2.0 MW8.2 mi
3100 Valleyview DriveSolar1.0 MW9.1 mi
Dodge Park Engine No 1Oil2.0 MW9.8 mi
ST-1/1A Engine No 1Oil1.3 MW9.9 mi
Renick Run Pumping Station 03-04Oil2.8 MW11.2 mi
Jackson Pike WWTP Cogen EnginesBiomass2.8 MW12.1 mi
Tosoh SMDNatural Gas3.5 MW12.6 mi
Igs Cmh4, LLCSolar4.2 MW12.6 mi
Vertiv SolarSolar1.1 MW15.4 mi
Big Plain Solar, LLCSolar196 MW17.5 mi

The largest power plant within 50 miles is Fox Squirrel Solar, a 577 MW solar plant 23 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Amazon Web Services data center, HilliardAmazon Web Services18 ac0.1 mi
Oppidan data center, HilliardOppidan2.0 ac0.7 mi
Amazon Web Services data center, AmlinAmazon Web Services20 ac2.3 mi
DartPoints DublinDartPoints—2.3 mi
Data center, HilliardOperator not recorded8.9 ac2.8 mi
Amazon Web Services data center, HilliardAmazon Web Services9.8 ac2.9 mi
Amazon Web Services data center, DublinAmazon Web Services22 ac4.6 mi

More

Data centers in Ohio · Data centers in Franklin County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me