62 data centers mapped in Ohio: 92 buildings covering about 346 acres of roof. The most are in Licking County (24). Most sit in EPA's Ohio Valley grid region, whose electricity is 38% natural gas, 28% nuclear and 25% coal, at 911 lb of CO₂ per megawatt-hour, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Sites62mapped data centers
Buildings92mapped footprints
Roof area346 acbuilding footprints
Counties13with a data center

Map of data centers in Ohio

Data centerUnder construction

What powers Ohio's data centers

A data center draws from its regional grid, not from one plant. These are the grid regions Ohio's data centers sit in, and what those regions generate:

Ohio Valley · 62 sites

911 lb CO₂ per MWh, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Natural Gas 38%Nuclear 28%Coal 25%Wind 5%

Share of electricity generated in EPA's Ohio Valley grid region (RFCW) in 2023, from eGRID. 524 TWh from 824 plants.

All power plants in Ohio →

By county

Operators

Amazon Web Services (13) · Google (10) · CyrusOne (5) · Meta (5) · Quality Technology Services (4) · Cologix (3) · Vantage (3) · DartPoints (2) · Aligned Data Centers (1) · Amazon Web Services us-east-2 datacenter (1) · Flexential (1) · H5 (1) · Oppidan (1) · T5 Data Centers (1)

Every mapped data center in Ohio

Data centerOperatorCity · CountyRoof area
Amazon Web Services data center, DublinAmazon Web ServicesDublin · Franklin22 ac
Amazon Web Services data center, New AlbanyAmazon Web ServicesNew Albany · Licking21 ac
Amazon Web Services data center, AmlinAmazon Web ServicesAmlin · Franklin20 ac
Amazon Web Services data center, DublinAmazon Web ServicesDublin · Union19 ac
Amazon Web Services data center, HilliardAmazon Web ServicesHilliard · Franklin18 ac
NAO 1/NAO 2MetaNew Albany · Licking15 ac
NAO 5/NAO 6MetaNew Albany · Licking14 ac
Amazon Web Services data center, Plain CityAmazon Web ServicesPlain City · Union14 ac
Google data center, LancasterGoogleLancaster · Fairfield13 ac
Amazon Web Services data center, HilliardAmazon Web ServicesHilliard · Franklin9.8 ac
Data center, HilliardOperator not recordedHilliard · Franklin8.9 ac
NAO 3MetaNew Albany · Licking8.4 ac
LCO 1MetaNew Albany · Licking8.3 ac
Amazon Web Services data center, New AlbanyAmazon Web ServicesNew Albany · Licking7.7 ac
Data center, 306 Greif Parkway, DelawareOperator not recordedDelaware · Delaware7.0 ac
LCO 2MetaNew Albany · Licking6.9 ac
Google data center, LockbourneGoogleLockbourne · Franklin6.6 ac
Google NBY-3GoogleNew Albany · Licking6.6 ac
Google NBY-6GoogleNew Albany · Licking6.6 ac
Google NBY-5GoogleNew Albany · Franklin6.6 ac
Google NBY-4GoogleNew Albany · Franklin6.5 ac
Google NBY-7GoogleNew Albany · Licking6.2 ac
Vantage Building 1VantageNew Albany · Licking5.6 ac
T5@ClevelandT5 Data CentersCleveland · Cuyahoga5.6 ac
Vantage Building 2VantageNew Albany · Licking5.4 ac
Google NBY-2GoogleNew Albany · Licking5.4 ac
QTS NAL1 DC2Quality Technology ServicesNew Albany · Licking5.2 ac
QTS NAL1 DC1Quality Technology ServicesNew Albany · Licking5.1 ac
Vantage Building 3VantageNew Albany · Licking5.1 ac
CIN5CyrusOneLebanon · Warren4.3 ac
QTS NAL 2 DC1Quality Technology ServicesNew Albany · Licking3.7 ac
Amazon Web Services CMH50Amazon Web ServicesNew Albany · Licking3.7 ac
Amazon Web Services CMH59Amazon Web ServicesNew Albany · Licking3.7 ac
Amazon Web Services CMH56Amazon Web ServicesNew Albany · Licking3.5 ac
Amazon Web Services CMH53Amazon Web ServicesNew Albany · Licking3.5 ac
QTS NAL 2 DC2Quality Technology ServicesNew Albany · Licking3.4 ac
Google NBY-1GoogleNew Albany · Licking3.2 ac
Amazon Web Services CMH62Amazon Web ServicesNew Albany · Licking3.1 ac
CIN7CyrusOneLebanon · Warren2.8 ac
TJX Corporate TechnoOperator not recordedNew Albany · Franklin2.3 ac
Cologix COL2CologixColumbus · Franklin2.3 ac
Oppidan data center, HilliardOppidanHilliard · Franklin2.0 ac
Cologix COL4CologixColumbus · Franklin2.0 ac
CyrusOne Cincinnati-Mason CIN3CyrusOneMason · Warren1.9 ac
LexisNexus SpringfieldOperator not recordedSpringfield · Clark1.8 ac
Compugen New AlbanyOperator not recordedNew Albany · Franklin1.8 ac
Carrier Services GroupOperator not recordedBoardman · Mahoning1.7 ac
H5 Data CenterH5Cleveland · Cuyahoga1.6 ac
Involta-AkronOperator not recordedAkron · Summit1.4 ac
Cologix COL1CologixColumbus · Franklin1.3 ac
CyrusOne CIN2CyrusOneCincinnati · Hamilton0.7 ac
Lumen ClevelandOperator not recordedCleveland · Cuyahoga0.7 ac
Involta IndependenceOperator not recordedIndependence · Cuyahoga0.6 ac
Data center, CincinnatiOperator not recordedCincinnati · Hamilton0.3 ac
Flexential CincinnatiFlexentialWest Chester · Butler—
CyrusOne Cincinnati-Hamilton CIN4CyrusOneHamilton · Butler—
Aligned Data Centers data center, SanduskyAligned Data CentersSandusky · Erie—
DartPoints DublinDartPoints43017 · Franklin—
Amazon AWS: Hilliard Data CenterAmazon Web Services us-east-2 datacenterHilliard · Franklin—
STACK New AlbanyOperator not recordedNew Albany · Franklin—
Google Lockbourne, OHGoogleLockbourne · Franklin—
DartPoints CincinnatiDartPointsCincinnati · Hamilton—

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me