Amazon Web Services CMH53

Amazon Web Services CMH53 is a data center in New Albany, Licking County, Ohio. It is mapped as 1 building covering about 3.5 acres (153,000 sq ft). Its power comes off the Ohio Valley grid (PJM Interconnection), which runs on 38% natural gas, 28% nuclear and 25% coal.

OperatorAmazon Web Servicesas mapped
Roof area3.5 ac1 building
Grid CO₂911 lbper MWh, RFCW region
Nearest plant12.4 miDenison Solar Array

Location

This data centerOther data centersPower plants (colored by fuel)

CountyLicking County, Ohio
Coordinates40.09364, -82.75156
On OpenStreetMapway/1020374277

What powers Amazon Web Services CMH53

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Ohio Valley grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 38% natural gas, 28% nuclear, 25% coal and 5% wind.

Each megawatt-hour carried about 911 lb of CO₂, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Natural Gas 38%Nuclear 28%Coal 25%Wind 5%

Share of electricity generated in EPA's Ohio Valley grid region (RFCW) in 2023, from eGRID. 524 TWh from 824 plants.

Utilities that serve Licking County

UtilityTypeGridBusiness rateIndustrial rate
Ohio Power CoInvestor OwnedPJM Interconnection16.5¢15.2¢
Duke Energy Ohio IncInvestor OwnedPJM Interconnection11.6¢8.7¢
South Central Power CompanyCooperativePJM Interconnection13.6¢10.8¢
Licking Rural Electric IncCooperativePJM Interconnection17.5¢13.4¢
Consolidated CooperativeCooperativePJM Interconnection14.8¢11.6¢
Guernsey-Muskingum El Coop IncCooperativePJM Interconnection16.3¢14.2¢

Utilities that report serving Licking County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Denison Solar ArraySolar1.9 MW12.4 mi
KrogerNatural Gas1.5 MW15.8 mi
Dodge Park Engine No 1Oil2.0 MW17.0 mi
ST-1/1A Engine No 1Oil1.3 MW17.1 mi
3100 Valleyview DriveSolar1.0 MW17.5 mi
Renick Run Pumping Station 03-04Oil2.8 MW17.9 mi
PS ST-8 Engine No 1Oil2.0 MW18.2 mi
Jackson Pike WWTP Cogen EnginesBiomass2.8 MW18.9 mi
Tosoh SMDNatural Gas3.5 MW21.3 mi
Vertiv SolarSolar1.1 MW22.6 mi

The largest power plant within 50 miles is Dresden Energy Facility, a 678 MW natural gas plant 38 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Amazon Web Services CMH50Amazon Web Services3.7 ac0.1 mi
Amazon Web Services CMH62Amazon Web Services3.1 ac0.2 mi
Amazon Web Services CMH59Amazon Web Services3.7 ac0.2 mi
Amazon Web Services CMH56Amazon Web Services3.5 ac0.2 mi
Vantage Building 3Vantage5.1 ac0.4 mi
Vantage Building 2Vantage5.4 ac0.5 mi
Amazon Web Services data center, New AlbanyAmazon Web Services7.7 ac0.6 mi
Vantage Building 1Vantage5.6 ac0.7 mi
Amazon Web Services data center, New AlbanyAmazon Web Services21 ac1.1 mi
NAO 1/NAO 2Meta15 ac1.7 mi
NAO 3Meta8.4 ac1.9 mi
QTS NAL1 DC1Quality Technology Services5.1 ac2.0 mi
LCO 2Meta6.9 ac2.1 mi
QTS NAL1 DC2Quality Technology Services5.2 ac2.1 mi
LCO 1Meta8.3 ac2.3 mi

And 13 more within 5 miles.

More

Data centers in Ohio · Data centers in Licking County · All Amazon Web Services data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me