24 data centers are mapped in Licking County, Ohio: 31 buildings covering about 161 acres (7,007,000 sq ft) of roof. Operators include Amazon Web Services, Google, Meta, Quality Technology Services. The county is in EPA's Ohio Valley grid region, whose electricity is 38% natural gas, 28% nuclear and 25% coal, at 911 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| Amazon Web Services data center, New Albany | New Albany | 21 ac |
| NAO 1/NAO 2 | New Albany | 15 ac |
| NAO 5/NAO 6 | New Albany | 14 ac |
| NAO 3 | New Albany | 8.4 ac |
| LCO 1 | New Albany | 8.3 ac |
| Amazon Web Services data center, New Albany | New Albany | 7.7 ac |
| LCO 2 | New Albany | 6.9 ac |
| Google NBY-3 | New Albany | 6.6 ac |
| Google NBY-6 | New Albany | 6.6 ac |
| Google NBY-7 | New Albany | 6.2 ac |
| Vantage Building 1 | New Albany | 5.6 ac |
| Vantage Building 2 | New Albany | 5.4 ac |
| Google NBY-2 | New Albany | 5.4 ac |
| QTS NAL1 DC2 | New Albany | 5.2 ac |
| QTS NAL1 DC1 | New Albany | 5.1 ac |
| Vantage Building 3 | New Albany | 5.1 ac |
| QTS NAL 2 DC1 | New Albany | 3.7 ac |
| Amazon Web Services CMH50 | New Albany | 3.7 ac |
| Amazon Web Services CMH59 | New Albany | 3.7 ac |
| Amazon Web Services CMH56 | New Albany | 3.5 ac |
| Amazon Web Services CMH53 | New Albany | 3.5 ac |
| QTS NAL 2 DC2 | New Albany | 3.4 ac |
| Google NBY-1 | New Albany | 3.2 ac |
| Amazon Web Services CMH62 | New Albany | 3.1 ac |
Data centers in Licking County draw from the regional grid. In 2023, electricity in EPA's Ohio Valley region was 38% natural gas, 28% nuclear, 25% coal and 5% wind, at 911 lb of CO₂ per megawatt-hour, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Ohio Valley grid region (RFCW) in 2023, from eGRID. 524 TWh from 824 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Ohio Power Co | 16.5¢ | 15.2¢ |
| Duke Energy Ohio Inc | 11.6¢ | 8.7¢ |
| South Central Power Company | 13.6¢ | 10.8¢ |
| Licking Rural Electric Inc | 17.5¢ | 13.4¢ |
| Consolidated Cooperative | 14.8¢ | 11.6¢ |
| Guernsey-Muskingum El Coop Inc | 16.3¢ | 14.2¢ |
Utilities that report serving Licking County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Denison Solar Array | Solar | 1.9 MW |
| Kroger | Natural Gas | 1.5 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.