Data Centers in Licking County, OH

24 data centers are mapped in Licking County, Ohio: 31 buildings covering about 161 acres (7,007,000 sq ft) of roof. Operators include Amazon Web Services, Google, Meta, Quality Technology Services. The county is in EPA's Ohio Valley grid region, whose electricity is 38% natural gas, 28% nuclear and 25% coal, at 911 lb of CO₂ per megawatt-hour.

Sites24mapped data centers
Buildings31mapped footprints
Roof area161 acbuilding footprints
GridPJM Interconnectionlargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Licking County

Data centerOperatorCityRoof area
Amazon Web Services data center, New AlbanyAmazon Web ServicesNew Albany21 ac
NAO 1/NAO 2MetaNew Albany15 ac
NAO 5/NAO 6MetaNew Albany14 ac
NAO 3MetaNew Albany8.4 ac
LCO 1MetaNew Albany8.3 ac
Amazon Web Services data center, New AlbanyAmazon Web ServicesNew Albany7.7 ac
LCO 2MetaNew Albany6.9 ac
Google NBY-3GoogleNew Albany6.6 ac
Google NBY-6GoogleNew Albany6.6 ac
Google NBY-7GoogleNew Albany6.2 ac
Vantage Building 1VantageNew Albany5.6 ac
Vantage Building 2VantageNew Albany5.4 ac
Google NBY-2GoogleNew Albany5.4 ac
QTS NAL1 DC2Quality Technology ServicesNew Albany5.2 ac
QTS NAL1 DC1Quality Technology ServicesNew Albany5.1 ac
Vantage Building 3VantageNew Albany5.1 ac
QTS NAL 2 DC1Quality Technology ServicesNew Albany3.7 ac
Amazon Web Services CMH50Amazon Web ServicesNew Albany3.7 ac
Amazon Web Services CMH59Amazon Web ServicesNew Albany3.7 ac
Amazon Web Services CMH56Amazon Web ServicesNew Albany3.5 ac
Amazon Web Services CMH53Amazon Web ServicesNew Albany3.5 ac
QTS NAL 2 DC2Quality Technology ServicesNew Albany3.4 ac
Google NBY-1GoogleNew Albany3.2 ac
Amazon Web Services CMH62Amazon Web ServicesNew Albany3.1 ac

What the grid here generates

Data centers in Licking County draw from the regional grid. In 2023, electricity in EPA's Ohio Valley region was 38% natural gas, 28% nuclear, 25% coal and 5% wind, at 911 lb of CO₂ per megawatt-hour, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Natural Gas 38%Nuclear 28%Coal 25%Wind 5%

Share of electricity generated in EPA's Ohio Valley grid region (RFCW) in 2023, from eGRID. 524 TWh from 824 plants.

Utilities that serve Licking County

UtilityTypeGridBusiness rateIndustrial rate
Ohio Power CoInvestor OwnedPJM Interconnection16.5¢15.2¢
Duke Energy Ohio IncInvestor OwnedPJM Interconnection11.6¢8.7¢
South Central Power CompanyCooperativePJM Interconnection13.6¢10.8¢
Licking Rural Electric IncCooperativePJM Interconnection17.5¢13.4¢
Consolidated CooperativeCooperativePJM Interconnection14.8¢11.6¢
Guernsey-Muskingum El Coop IncCooperativePJM Interconnection16.3¢14.2¢

Utilities that report serving Licking County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Licking County

PlantFuelCapacity
Denison Solar ArraySolar1.9 MW
KrogerNatural Gas1.5 MW

All power plants in Licking County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me