43 CyrusOne data centers are mapped in the U.S. on OpenStreetMap, in 11 states: 45 buildings covering about 149 acres (6,493,000 sq ft) of roof. Weighted by building size, the grids they sit on average 714 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).
Data centerUnder construction
| Grid region | Sites | CO₂ lb/MWh |
|---|---|---|
| Ohio Valley | 11 | 911 |
| Texas (ERCOT) | 10 | 733 |
| Mid-Atlantic | 8 | 594 |
| Southwest (Arizona/New Mexico) | 7 | 703 |
| Virginia/Carolinas | 4 | 590 |
| New England | 1 | 537 |
| Upper Midwest | 1 | 920 |
| Upstate New York | 1 | 241 |
| Data center | Place | Roof area |
|---|---|---|
| PHX4 | Chandler, Arizona | 4.9 ac |
| PHX7 | Chandler, Arizona | 3.3 ac |
| PHX8 | Chandler, Arizona | 3.2 ac |
| PHX1 | Chandler, Arizona | 3.1 ac |
| PHX3 | Chandler, Arizona | 2.4 ac |
| PHX6 | Chandler, Arizona | 2.3 ac |
| PHX5 | Chandler, Arizona | 2.2 ac |
| NYM5 | Norwalk, Connecticut | 1.8 ac |
| OCB1 | Council Bluffs, Iowa | 2.7 ac |
| CHI1 | Aurora, Illinois | 6.3 ac |
| CHI2 | Aurora, Illinois | 4.9 ac |
| CyrusOne CHI9 | Aurora, Illinois | 4.9 ac |
| CHI3 | Aurora, Illinois | 3.9 ac |
| CyrusOne CHI6 | Wood Dale, Illinois | 1.2 ac |
| CIN6 | Florence, Kentucky | 3.2 ac |
| DUR1 | Durham, North Carolina | 6.2 ac |
| DUR2 | Durham, North Carolina | 1.9 ac |
| NYM1 | Somerset, New Jersey | 7.0 ac |
| NYM2 | Totowa, New Jersey | 2.7 ac |
| NYM7 | Wappingers Falls, New York | 1.5 ac |
| CIN5 | Lebanon, Ohio | 4.3 ac |
| CIN7 | Lebanon, Ohio | 2.8 ac |
| CyrusOne Cincinnati-Mason CIN3 | Mason, Ohio | 1.9 ac |
| CyrusOne CIN2 | Cincinnati, Ohio | 0.7 ac |
| CyrusOne Cincinnati-Hamilton CIN4 | Hamilton, Ohio | — |
| DFW3 | Allen, Texas | 7.8 ac |
| AUS3 | Austin, Texas | 4.1 ac |
| CyrusOne SAT10 & SAT11 | San Antonio, Texas | 4.0 ac |
| DFW7 | Fort Worth, Texas | 3.9 ac |
| DFW4 | Allen, Texas | 2.7 ac |
| CyrusOne San Antonio II | San Antonio, Texas | 2.5 ac |
| CyrusOne San Antonio I | San Antonio, Texas | 2.3 ac |
| CyrusOne San Antonio III | San Antonio, Texas | 2.3 ac |
| CyrusOne San Antonio IV | San Antonio, Texas | 2.1 ac |
| AUS2 | Austin, Texas | 1.8 ac |
| CyrusOne NVA5 | Sterling, Virginia | 12 ac |
| CyrusOne Sterling NVA9 | Sterling, Virginia | 6.1 ac |
| CyrusOne NVA1/NVA2/NVA3 | Sterling, Virginia | 6.1 ac |
| CyrusOne NVA8 | Sterling, Virginia | 3.5 ac |
| CyrusOne NVA14 | Ashburn, Virginia | 3.0 ac |
| CyrusOne NVA4 | Sterling, Virginia | 2.9 ac |
| CyrusOne NVA9 | Sterling, Virginia | 1.9 ac |
| CyrusOne NVA7 | Sterling, Virginia | 1.4 ac |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.