CyrusOne Data Centers

43 CyrusOne data centers are mapped in the U.S. on OpenStreetMap, in 11 states: 45 buildings covering about 149 acres (6,493,000 sq ft) of roof. Weighted by building size, the grids they sit on average 714 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).

Sites43mapped
States11with a site
Buildings45mapped footprints
Roof area149 acbuilding footprints

Map of CyrusOne data centers

Data centerUnder construction

By grid region

Grid regionSitesCO₂ lb/MWhLargest sources
Ohio Valley1191138% natural gas, 28% nuclear and 25% coal
Texas (ERCOT)1073350% natural gas, 23% wind and 13% coal
Mid-Atlantic859454% natural gas, 36% nuclear and 5% coal
Southwest (Arizona/New Mexico)770349% natural gas, 18% nuclear and 11% coal
Virginia/Carolinas459040% nuclear, 39% natural gas and 10% coal
New England153756% natural gas, 23% nuclear and 8% hydroelectric
Upper Midwest192038% wind, 35% coal and 13% natural gas
Upstate New York124133% hydroelectric, 32% nuclear and 25% natural gas

Every mapped site

Data centerPlaceGrid regionRoof area
PHX4Chandler, ArizonaSouthwest (Arizona/New Mexico)4.9 ac
PHX7Chandler, ArizonaSouthwest (Arizona/New Mexico)3.3 ac
PHX8Chandler, ArizonaSouthwest (Arizona/New Mexico)3.2 ac
PHX1Chandler, ArizonaSouthwest (Arizona/New Mexico)3.1 ac
PHX3Chandler, ArizonaSouthwest (Arizona/New Mexico)2.4 ac
PHX6Chandler, ArizonaSouthwest (Arizona/New Mexico)2.3 ac
PHX5Chandler, ArizonaSouthwest (Arizona/New Mexico)2.2 ac
NYM5Norwalk, ConnecticutNew England1.8 ac
OCB1Council Bluffs, IowaUpper Midwest2.7 ac
CHI1Aurora, IllinoisOhio Valley6.3 ac
CHI2Aurora, IllinoisOhio Valley4.9 ac
CyrusOne CHI9Aurora, IllinoisOhio Valley4.9 ac
CHI3Aurora, IllinoisOhio Valley3.9 ac
CyrusOne CHI6Wood Dale, IllinoisOhio Valley1.2 ac
CIN6Florence, KentuckyOhio Valley3.2 ac
DUR1Durham, North CarolinaVirginia/Carolinas6.2 ac
DUR2Durham, North CarolinaVirginia/Carolinas1.9 ac
NYM1Somerset, New JerseyMid-Atlantic7.0 ac
NYM2Totowa, New JerseyMid-Atlantic2.7 ac
NYM7Wappingers Falls, New YorkUpstate New York1.5 ac
CIN5Lebanon, OhioOhio Valley4.3 ac
CIN7Lebanon, OhioOhio Valley2.8 ac
CyrusOne Cincinnati-Mason CIN3Mason, OhioOhio Valley1.9 ac
CyrusOne CIN2Cincinnati, OhioOhio Valley0.7 ac
CyrusOne Cincinnati-Hamilton CIN4Hamilton, OhioOhio Valley—
DFW3Allen, TexasTexas (ERCOT)7.8 ac
AUS3Austin, TexasTexas (ERCOT)4.1 ac
CyrusOne SAT10 & SAT11San Antonio, TexasTexas (ERCOT)4.0 ac
DFW7Fort Worth, TexasTexas (ERCOT)3.9 ac
DFW4Allen, TexasTexas (ERCOT)2.7 ac
CyrusOne San Antonio IISan Antonio, TexasTexas (ERCOT)2.5 ac
CyrusOne San Antonio ISan Antonio, TexasTexas (ERCOT)2.3 ac
CyrusOne San Antonio IIISan Antonio, TexasTexas (ERCOT)2.3 ac
CyrusOne San Antonio IVSan Antonio, TexasTexas (ERCOT)2.1 ac
AUS2Austin, TexasTexas (ERCOT)1.8 ac
CyrusOne NVA5Sterling, VirginiaMid-Atlantic12 ac
CyrusOne Sterling NVA9Sterling, VirginiaVirginia/Carolinas6.1 ac
CyrusOne NVA1/NVA2/NVA3Sterling, VirginiaMid-Atlantic6.1 ac
CyrusOne NVA8Sterling, VirginiaMid-Atlantic3.5 ac
CyrusOne NVA14Ashburn, VirginiaMid-Atlantic3.0 ac
CyrusOne NVA4Sterling, VirginiaMid-Atlantic2.9 ac
CyrusOne NVA9Sterling, VirginiaVirginia/Carolinas1.9 ac
CyrusOne NVA7Sterling, VirginiaMid-Atlantic1.4 ac

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me