PHX5 is a data center run by CyrusOne in Chandler, Maricopa County, Arizona. It is mapped as 1 building covering about 2.2 acres (94,000 sq ft). Its power comes off the Southwest (Arizona/New Mexico) grid (Arizona Public Service), which runs on 49% natural gas, 18% nuclear and 11% coal.
This data centerOther data centersPower plants (colored by fuel)
| Address | 2335 South Ellis Street, Chandler AZ 85286 |
|---|---|
| County | Maricopa County, Arizona |
| Coordinates | 33.26974, -111.88150 |
| Website | www.cyrusone.com/data-centers/north-america/chandler-arizona |
| On OpenStreetMap | way/977653859 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Southwest (Arizona/New Mexico) grid region, and the county's largest utility is on the Arizona Public Service grid. In 2023, the region's electricity was 49% natural gas, 18% nuclear, 11% coal and 8% solar.
Each megawatt-hour carried about 703 lb of CO₂, close to the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Southwest (Arizona/New Mexico) grid region (AZNM) in 2023, from eGRID. 176 TWh from 387 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Arizona Public Service Co | 13.2¢ | 10.2¢ |
| Salt River Project | 10.8¢ | 7.7¢ |
| City of Mesa - (AZ) | 14.0¢ | — |
| USBIA-San Carlos Project | 17.9¢ | 15.7¢ |
| Gila River Indian Utility Authority (GRICUA) | 12.5¢ | — |
| Electrical Dist No8 Maricopa | — | 6.0¢ |
| WAPA-- Western Area Power Administration | 2.6¢ | 1.9¢ |
Utilities that report serving Maricopa County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Intel - Ocotillo Campus Solar | Solar | 4.2 MW | 1.9 mi |
| Kyrene | Natural Gas | 596 MW | 6.7 mi |
| Superstition Energy Storage | Battery Storage | 90.0 MW | 6.8 mi |
| Gilbert Solar Facility I, LLC | Solar | 2.0 MW | 7.5 mi |
| Santan | Natural Gas | 1,326 MW | 8.7 mi |
| Arizona State University CHP | Natural Gas | 17.1 MW | 10.5 mi |
| Ocotillo | Natural Gas | 806 MW | 10.7 mi |
| AZ State University - Tempe Campus Solar | Solar | 2.5 MW | 11.0 mi |
| Crosscut | Hydroelectric | 3.0 MW | 12.3 mi |
| Phoenix Airport East Economy Lot | Solar | 1.1 MW | 12.8 mi |
The largest power plant within 50 miles is Santan, a 1,326 MW natural gas plant 9 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| PHX1 | 3.1 ac | 0.1 mi |
| PHX4 | 4.9 ac | 0.1 mi |
| PHX3 | 2.4 ac | 0.1 mi |
| PHX6 | 2.3 ac | 0.2 mi |
| PHX7 | 3.3 ac | 0.2 mi |
| PHX8 | 3.2 ac | 0.3 mi |
| Digital Realty Phoenix PHX15 | 6.7 ac | 0.5 mi |
| H5 Phoenix | 1.2 ac | 0.6 mi |
| Emailage | — | 3.3 mi |
Data centers in Arizona · Data centers in Maricopa County · All CyrusOne data centers · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.