Electric generating plantEIA plant no. 58543

Gilbert Solar Facility I, LLC

Type
Solar Photovoltaic
Nameplate capacity
2.0 MW
Units
1
In service since
2011
Operator
Gilbert Solar Facility I, LLC
Location
Gilbert, Maricopa County, Arizona
Rated 185th largest in Arizona · 11103rd of 14,761 in the U.S. · by nameplate

Gilbert Solar Facility I, LLC is a solar power plant in Arizona with a nameplate capacity of 2.0 MW. It generates roughly 3.6k MWh per year — enough to power about 339 average U.S. homes.

Its capacity factor of 20% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Gilbert Solar Facility I, LLC could make 17.5k MWh. In 2023 it made 3.6k MWh — the same as running at full power 20 hours in every 100.

Nameplate, full year17.5k MWh2.0 MW × 8,760 hours
Actually generated3.6k MWhEPA eGRID, 2023 · ≈339 homes

Peaking or variableCapacity factor 20%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarBattery Storage

Location

Address402 North Neely Street
CityGilbert
CountyMaricopa County
StateArizona
ZIP85223
Coordinates33.35586, -111.80236
OperatorGilbert Solar Facility I, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
1Solar PhotovoltaicSolar2.0 MWOperating2011

Grid context

NERC RegionWECC
Balancing AuthorityArizona Public Service Company

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Maricopa County

View all plants in Maricopa County →

Data centers near Gilbert Solar Facility I, LLC

Data centerOperatorDistance
GoDaddy - GilbertNot recorded2.2 mi
StrongMindNot recorded2.4 mi
All About Serving Process ServerNot recorded2.5 mi
OptimumHQNot recorded3.3 mi
The Chatfield GroupNot recorded3.3 mi
EmailageNot recorded4.3 mi
Alliance TechnologyNot recorded4.6 mi
Centersquare: Phoenix - (PHX1 - Mesa)Centersquare5.6 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map