Data Centers in Maricopa County, AZ

58 data centers are mapped in Maricopa County, Arizona: 61 buildings covering about 238 acres (10,350,000 sq ft) of roof. Operators include CyrusOne, Microsoft, Iron Mountain, Digital Realty. The county is in EPA's Southwest (Arizona/New Mexico) grid region, whose electricity is 49% natural gas, 18% nuclear and 11% coal, at 703 lb of CO₂ per megawatt-hour.

Sites58mapped data centers
Buildings61mapped footprints
Roof area238 acbuilding footprints
GridArizona Public Servicelargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Maricopa County

Data centerOperatorCityRoof area
Apple Data CenterApple Inc.Mesa59 ac
EdgeConneX PHX02 Data CenterEdgeConneXMesa15 ac
Data center, MesaOperator not recordedMesa15 ac
Data center, MesaOperator not recordedMesa15 ac
Aligned Energy Data CenterAlignedPhoenix12 ac
Stream Data Centers PHX-1StreamGoodyear9.4 ac
Data center, MesaOperator not recordedMesa7.7 ac
QTSQuality Technology ServicesPhoenix7.3 ac
Digital Realty Phoenix PHX15Digital RealtyChandler6.7 ac
Data center, MesaOperator not recordedMesa6.6 ac
PHX-11MicrosoftGoodyear5.7 ac
PHX-12MicrosoftGoodyear5.6 ac
PHX-13MicrosoftGoodyear5.6 ac
PHX-14MicrosoftGoodyear5.6 ac
PHX-10MicrosoftGoodyear5.6 ac
Vantage Data Centers data center, GoodyearVantage Data CentersGoodyear5.5 ac
Data center, 850 South Bullard Avenue, GoodyearOperator not recordedGoodyear5.1 ac
PHX4CyrusOneChandler4.9 ac
Iron Mountain Records StorageIron MountainPhoenix3.3 ac
PHX7CyrusOneChandler3.3 ac
PHX8CyrusOneChandler3.2 ac
PHX1CyrusOneChandler3.1 ac
EdgeCoreOperator not recordedMesa2.6 ac
Flexential Phoenix - Deer ValleyFlexentialPhoenix2.5 ac
PHX3CyrusOneChandler2.4 ac
PHX6CyrusOneChandler2.3 ac
PHX5CyrusOneChandler2.2 ac
GoDaddy - GilbertOperator not recordedGilbert2.1 ac
EdgeConneX data center, TempeEdgeConneXTempe1.9 ac
PhoenixNAPOperator not recordedPhoenix1.8 ac
Digital Realty Data CenterDigital RealtyTempe1.5 ac
Centersquare: Phoenix - (PHX1 - Mesa)CentersquareMesa1.3 ac
Cogent Data CenterCogent Communications, Inc.Phoenix1.2 ac
H5 PhoenixH5Chandler1.2 ac
Data Storage CentersOperator not recordedPhoenix0.9 ac
AZ LabsOperator not recordedHigley0.7 ac
LumenLumen TechnologiesPhoenix0.6 ac
Myndshift TechnologiesOperator not recordedMesa0.5 ac
StrongMindOperator not recordedChandler0.5 ac
Omnis NetworkOperator not recordedTempe0.4 ac
1GServersOperator not recordedPhoenix0.4 ac
L3Harris Technologies IncOperator not recordedHigley0.3 ac
OptimumHQOperator not recordedMesa—
The Chatfield GroupOperator not recordedMesa—
All About Serving Process ServerOperator not recordedChandler—
EmailageOperator not recordedChandler—
Alliance TechnologyOperator not recordedMesa—
VaultLogixOperator not recordedScottsdale—
Profit Finder Pro SoftwareOperator not recordedScottsdale—
DataPro USA Web DevelopmentOperator not recordedScottsdale—
K-Motion InteractiveOperator not recordedScottsdale—
Iron Mountain Data Centers AZS-1Iron MountainScottsdale—
Accelera Data SystemsOperator not recordedPhoenix—
Alembic Computer Services, Inc.Operator not recordedTempe—
J-Curve TechnologiesOperator not recordedTempe—
ComarchOperator not recordedMesa—
Iron Mountain AZP-2Iron MountainPhoenix—
Iron Mountain AZP-1Iron MountainPhoenix—

What the grid here generates

Data centers in Maricopa County draw from the regional grid. In 2023, electricity in EPA's Southwest (Arizona/New Mexico) region was 49% natural gas, 18% nuclear, 11% coal and 8% solar, at 703 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).

Natural Gas 49%Nuclear 18%Coal 11%Solar 8%Wind 8%Geothermal 4%Hydroelectric 3%

Share of electricity generated in EPA's Southwest (Arizona/New Mexico) grid region (AZNM) in 2023, from eGRID. 176 TWh from 387 plants.

Utilities that serve Maricopa County

UtilityTypeGridBusiness rateIndustrial rate
Arizona Public Service CoInvestor OwnedArizona Public Service13.2¢10.2¢
Salt River ProjectPolitical SubdivisionSalt River Project10.8¢7.7¢
City of Mesa - (AZ)MunicipalWestern Area Power Administration - Desert Southwest Region14.0¢—
USBIA-San Carlos ProjectFederalWestern Area Power Administration - Desert Southwest Region17.9¢15.7¢
Gila River Indian Utility Authority (GRICUA)CooperativeWestern Area Power Administration - Desert Southwest Region12.5¢—
Electrical Dist No8 MaricopaPolitical SubdivisionArizona Public Service—6.0¢
WAPA-- Western Area Power AdministrationFederalWestern Area Power Administration - Desert Southwest Region2.6¢1.9¢

Utilities that report serving Maricopa County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Maricopa County

PlantFuelCapacity
Palo VerdeNuclear4,210 MW
SantanNatural Gas1,326 MW
Harquahala Generating ProjectNatural Gas1,277 MW
West PhoenixNatural Gas1,207 MW
Red HawkNatural Gas1,127 MW
OcotilloNatural Gas806 MW
Sonoran Solar EnergySolar750 MW
Agua FriaNatural Gas738 MW
Arlington Valley Energy FacilityNatural Gas713 MW
Mesquite Generating Station Block 2Natural Gas692 MW
Mesquite Generating Station Block 1Natural Gas692 MW
Gila River Power Block 4Natural Gas619 MW
Gila River Power Block 1Natural Gas619 MW
Gila River Power Block 3Natural Gas619 MW
Gila River Power Block 2Natural Gas619 MW

All power plants in Maricopa County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me