60 data centers mapped in Arizona: 63 buildings covering about 238 acres of roof. The most are in Maricopa County (58). Most sit in EPA's Southwest (Arizona/New Mexico) grid region, whose electricity is 49% natural gas, 18% nuclear and 11% coal, at 703 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).
Data centerUnder construction
A data center draws from its regional grid, not from one plant. These are the grid regions Arizona's data centers sit in, and what those regions generate:
703 lb CO₂ per MWh, close to the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Southwest (Arizona/New Mexico) grid region (AZNM) in 2023, from eGRID. 176 TWh from 387 plants.
CyrusOne (7) · Microsoft (5) · Iron Mountain (4) · Digital Realty (2) · DirecTV (2) · EdgeConneX (2) · Aligned (1) · Apple Inc. (1) · Centersquare (1) · Cogent Communications, Inc. (1) · Flexential (1) · H5 (1) · Lumen Technologies (1) · Quality Technology Services (1) · Stream (1) · Vantage Data Centers (1)
| Data center | City · County | Roof area |
|---|---|---|
| Apple Data Center | Mesa · Maricopa | 59 ac |
| EdgeConneX PHX02 Data Center | Mesa · Maricopa | 15 ac |
| Data center, Mesa | Mesa · Maricopa | 15 ac |
| Data center, Mesa | Mesa · Maricopa | 15 ac |
| Aligned Energy Data Center | Phoenix · Maricopa | 12 ac |
| Stream Data Centers PHX-1 | Goodyear · Maricopa | 9.4 ac |
| Data center, Mesa | Mesa · Maricopa | 7.7 ac |
| QTS | Phoenix · Maricopa | 7.3 ac |
| Digital Realty Phoenix PHX15 | Chandler · Maricopa | 6.7 ac |
| Data center, Mesa | Mesa · Maricopa | 6.6 ac |
| PHX-11 | Goodyear · Maricopa | 5.7 ac |
| PHX-12 | Goodyear · Maricopa | 5.6 ac |
| PHX-13 | Goodyear · Maricopa | 5.6 ac |
| PHX-14 | Goodyear · Maricopa | 5.6 ac |
| PHX-10 | Goodyear · Maricopa | 5.6 ac |
| Vantage Data Centers data center, Goodyear | Goodyear · Maricopa | 5.5 ac |
| Data center, 850 South Bullard Avenue, Goodyear | Goodyear · Maricopa | 5.1 ac |
| PHX4 | Chandler · Maricopa | 4.9 ac |
| Iron Mountain Records Storage | Phoenix · Maricopa | 3.3 ac |
| PHX7 | Chandler · Maricopa | 3.3 ac |
| PHX8 | Chandler · Maricopa | 3.2 ac |
| PHX1 | Chandler · Maricopa | 3.1 ac |
| EdgeCore | Mesa · Maricopa | 2.6 ac |
| Flexential Phoenix - Deer Valley | Phoenix · Maricopa | 2.5 ac |
| PHX3 | Chandler · Maricopa | 2.4 ac |
| PHX6 | Chandler · Maricopa | 2.3 ac |
| PHX5 | Chandler · Maricopa | 2.2 ac |
| GoDaddy - Gilbert | Gilbert · Maricopa | 2.1 ac |
| EdgeConneX data center, Tempe | Tempe · Maricopa | 1.9 ac |
| PhoenixNAP | Phoenix · Maricopa | 1.8 ac |
| Digital Realty Data Center | Tempe · Maricopa | 1.5 ac |
| Centersquare: Phoenix - (PHX1 - Mesa) | Mesa · Maricopa | 1.3 ac |
| Cogent Data Center | Phoenix · Maricopa | 1.2 ac |
| H5 Phoenix | Chandler · Maricopa | 1.2 ac |
| Data Storage Centers | Phoenix · Maricopa | 0.9 ac |
| AZ Labs | Higley · Maricopa | 0.7 ac |
| Lumen | Phoenix · Maricopa | 0.6 ac |
| Myndshift Technologies | Mesa · Maricopa | 0.5 ac |
| StrongMind | Chandler · Maricopa | 0.5 ac |
| Omnis Network | Tempe · Maricopa | 0.4 ac |
| 1GServers | Phoenix · Maricopa | 0.4 ac |
| L3Harris Technologies Inc | Higley · Maricopa | 0.3 ac |
| DirecTV data center, 9608 East Old Vail Road, Tucson | Tucson · Pima | 0.3 ac |
| DirecTV data center, 401 Direct Way, Benson | Benson · Cochise | 0.2 ac |
| OptimumHQ | Mesa · Maricopa | — |
| The Chatfield Group | Mesa · Maricopa | — |
| All About Serving Process Server | Chandler · Maricopa | — |
| Emailage | Chandler · Maricopa | — |
| Alliance Technology | Mesa · Maricopa | — |
| VaultLogix | Scottsdale · Maricopa | — |
| Profit Finder Pro Software | Scottsdale · Maricopa | — |
| DataPro USA Web Development | Scottsdale · Maricopa | — |
| K-Motion Interactive | Scottsdale · Maricopa | — |
| Iron Mountain Data Centers AZS-1 | Scottsdale · Maricopa | — |
| Accelera Data Systems | Phoenix · Maricopa | — |
| Alembic Computer Services, Inc. | Tempe · Maricopa | — |
| J-Curve Technologies | Tempe · Maricopa | — |
| Comarch | Mesa · Maricopa | — |
| Iron Mountain AZP-2 | Phoenix · Maricopa | — |
| Iron Mountain AZP-1 | Phoenix · Maricopa | — |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.