DirecTV data center, 401 Direct Way, Benson

DirecTV data center, 401 Direct Way, Benson is a data center in Benson, Cochise County, Arizona. It is mapped as 1 building covering about 7,500 sq ft. Its power comes off the Southwest (Arizona/New Mexico) grid (Arizona Public Service), which runs on 49% natural gas, 18% nuclear and 11% coal.

OperatorDirecTVas mapped
Roof area0.2 ac1 building
Grid CO₂703 lbper MWh, AZNM region
Nearest plant18.6 miRed Horse III

Location

This data centerOther data centersPower plants (colored by fuel)

Address401 Direct Way, Benson AZ 85602
CountyCochise County, Arizona
Coordinates31.97269, -110.30479
On OpenStreetMapway/1042260902

What powers DirecTV data center, 401 Direct Way, Benson

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Southwest (Arizona/New Mexico) grid region, and the county's largest utility is on the Arizona Public Service grid. In 2023, the region's electricity was 49% natural gas, 18% nuclear, 11% coal and 8% solar.

Each megawatt-hour carried about 703 lb of CO₂, close to the U.S. grid as a whole (765 lb).

Natural Gas 49%Nuclear 18%Coal 11%Solar 8%Wind 8%Geothermal 4%Hydroelectric 3%

Share of electricity generated in EPA's Southwest (Arizona/New Mexico) grid region (AZNM) in 2023, from eGRID. 176 TWh from 387 plants.

Utilities that serve Cochise County

UtilityTypeGridBusiness rateIndustrial rate
Arizona Public Service CoInvestor OwnedArizona Public Service13.2¢10.2¢
Tucson Electric Power CoInvestor OwnedTucson Electric Power Company15.6¢10.0¢
Sulphur Springs Valley E C IncCooperativeWestern Area Power Administration - Desert Southwest Region10.7¢12.0¢
WAPA-- Western Area Power AdministrationFederalWestern Area Power Administration - Desert Southwest Region2.6¢1.9¢

Utilities that report serving Cochise County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Red Horse IIISolar30.0 MW18.6 mi
Babacomari SolarSolar160 MW22.8 mi
Roadrunner Solar and BESSBattery Storage470 MW23.0 mi
Sulphur SpringsSolar20.0 MW23.4 mi
Apache StationCoal782 MW24.9 mi
Red Horse 2Solar81.0 MW25.1 mi
Apache Solar ISolar40.0 MW25.2 mi
Wilmot Energy Center IIBattery Storage200 MW28.7 mi
Fort Huachuca Solar PV ProjectSolar17.7 MW29.0 mi
Roadrunner Reserve Phase 1Battery Storage200 MW30.7 mi

The largest power plant within 50 miles is Apache Station, a 782 MW coal plant 25 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

More

Data centers in Arizona · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me