Electric generating plantEIA plant no. 67823

Roadrunner Solar and BESS

Type
Battery Storage
Nameplate capacity
470 MW
Units
1
In service since
2025
Operator
Clenera LLC
Location
Cochise, Cochise County, Arizona
Rated 34th largest in Arizona · 790th of 14,761 in the U.S. · by nameplate

Roadrunner Solar and BESS is a battery storage power plant in Arizona with a nameplate capacity of 470 MW.

The 470 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

CoalSolarBattery Storage

Location

Address4402 Cochise Stronghold Rd
CityCochise
CountyCochise County
StateArizona
ZIP85606
Coordinates32.08615, -109.93528
OperatorClenera LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
RRPVSolar PhotovoltaicSolar235 MWOperating2025

Grid context

NERC RegionWECC
Balancing AuthorityWestern Area Power Administration - Desert Southwest Region

About Battery Storage plants

Battery storage facilities don't generate electricity — they store it. They charge from the grid (often from solar during the day) and discharge during peak demand or to firm up renewables. EIA classifies them as power plants because they connect to the grid like one.

Other plants in Cochise County

View all plants in Cochise County →

Data centers near Roadrunner Solar and BESS

Data centerOperatorDistance
DirecTV data center, 401 Direct Way, BensonDirecTV23.0 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more