Vantage Data Centers Data Centers

15 Vantage Data Centers data centers are mapped in the U.S. on OpenStreetMap, in 4 states: 17 buildings covering about 49.0 acres (2,135,000 sq ft) of roof. Weighted by building size, the grids they sit on average 643 lb of CO₂ per megawatt-hour, 16% cleaner than the U.S. grid as a whole (765 lb).

Sites15mapped
States4with a site
Buildings17mapped footprints
Roof area49 acbuilding footprints

Map of Vantage Data Centers data centers

Data centerUnder construction

By grid region

Grid regionSitesCO₂ lb/MWhLargest sources
Mid-Atlantic859454% natural gas, 36% nuclear and 5% coal
Texas (ERCOT)573350% natural gas, 23% wind and 13% coal
Southwest (Arizona/New Mexico)170349% natural gas, 18% nuclear and 11% coal
California142643% natural gas, 20% solar and 14% hydroelectric

Every mapped site

Data centerPlaceGrid regionRoof area
Vantage Data Centers data center, GoodyearGoodyear, ArizonaSouthwest (Arizona/New Mexico)5.5 ac
Vantage Santa Clara CA2Santa Clara, CaliforniaCalifornia3.0 ac
Vantage TX12San Antonio, TexasTexas (ERCOT)8.7 ac
Vantage TX11San Antonio, TexasTexas (ERCOT)2.8 ac
Vantage Data Centers TX21San Antonio, TexasTexas (ERCOT)2.6 ac
Vantage Data Centers TX22San Antonio, TexasTexas (ERCOT)2.6 ac
Vantage San Antonio ISan Antonio, TexasTexas (ERCOT)—
Vantage VA3Ashburn, VirginiaMid-Atlantic6.2 ac
Vantage VA2Sterling, VirginiaMid-Atlantic4.3 ac
Vantage VA11Sterling, VirginiaMid-Atlantic2.9 ac
Vantage VA13Sterling, VirginiaMid-Atlantic2.8 ac
Vantage VA14Sterling, VirginiaMid-Atlantic2.8 ac
Vantage VA12Sterling, VirginiaMid-Atlantic2.6 ac
Vantage VA16Sterling, VirginiaMid-Atlantic1.5 ac
Vantage VA15Sterling, VirginiaMid-Atlantic0.7 ac

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me