15 Vantage Data Centers data centers are mapped in the U.S. on OpenStreetMap, in 4 states: 17 buildings covering about 49.0 acres (2,135,000 sq ft) of roof. Weighted by building size, the grids they sit on average 643 lb of CO₂ per megawatt-hour, 16% cleaner than the U.S. grid as a whole (765 lb).
Data centerUnder construction
| Grid region | Sites | CO₂ lb/MWh |
|---|---|---|
| Mid-Atlantic | 8 | 594 |
| Texas (ERCOT) | 5 | 733 |
| Southwest (Arizona/New Mexico) | 1 | 703 |
| California | 1 | 426 |
| Data center | Place | Roof area |
|---|---|---|
| Vantage Data Centers data center, Goodyear | Goodyear, Arizona | 5.5 ac |
| Vantage Santa Clara CA2 | Santa Clara, California | 3.0 ac |
| Vantage TX12 | San Antonio, Texas | 8.7 ac |
| Vantage TX11 | San Antonio, Texas | 2.8 ac |
| Vantage Data Centers TX21 | San Antonio, Texas | 2.6 ac |
| Vantage Data Centers TX22 | San Antonio, Texas | 2.6 ac |
| Vantage San Antonio I | San Antonio, Texas | — |
| Vantage VA3 | Ashburn, Virginia | 6.2 ac |
| Vantage VA2 | Sterling, Virginia | 4.3 ac |
| Vantage VA11 | Sterling, Virginia | 2.9 ac |
| Vantage VA13 | Sterling, Virginia | 2.8 ac |
| Vantage VA14 | Sterling, Virginia | 2.8 ac |
| Vantage VA12 | Sterling, Virginia | 2.6 ac |
| Vantage VA16 | Sterling, Virginia | 1.5 ac |
| Vantage VA15 | Sterling, Virginia | 0.7 ac |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.