Vantage San Antonio I is a data center run by Vantage Data Centers in San Antonio, Bexar County, Texas. Its power comes off the Texas (ERCOT) grid (ERCOT), which runs on 50% natural gas, 23% wind and 13% coal.
This data centerOther data centersPower plants (colored by fuel)
| County | Bexar County, Texas |
|---|---|
| Coordinates | 29.41540, -98.78936 |
| On OpenStreetMap | way/1344369112 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Texas (ERCOT) grid region, and the county's largest utility is on the ERCOT grid. In 2023, the region's electricity was 50% natural gas, 23% wind, 13% coal and 9% nuclear.
Each megawatt-hour carried about 733 lb of CO₂, close to the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Texas (ERCOT) grid region (ERCT) in 2023, from eGRID. 477 TWh from 749 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| City of San Antonio - (TX) | 10.1¢ | 8.8¢ |
| Pedernales Electric Coop, Inc | 12.8¢ | 6.4¢ |
| Guadalupe Valley Elec Coop Inc | 11.4¢ | 5.4¢ |
| Bandera Electric Coop, Inc | 10.5¢ | 9.0¢ |
| Karnes Electric Coop Inc | 9.2¢ | 6.2¢ |
Utilities that report serving Bexar County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Heb_cps00085 | Natural Gas | 1.6 MW | 5.3 mi |
| Nelson Gardens Landfill Gas to Energy | Biomass | 4.4 MW | 9.8 mi |
| Commerce ESS | Other Fossil | 10.0 MW | 10.4 mi |
| Commerce Solar | Solar | 5.0 MW | 10.4 mi |
| Leon Creek | Natural Gas | 230 MW | 13.6 mi |
| Ferdinand Energy Center | Battery Storage | 200 MW | 13.6 mi |
| Ranchtown | Other Fossil | 9.9 MW | 14.3 mi |
| SunE CPS3 LLC | Solar | 10.6 MW | 15.2 mi |
| Regis Medina Lake | Battery Storage | 9.9 MW | 16.2 mi |
| Bexar ESS | Battery Storage | 100 MW | 22.4 mi |
The largest power plant within 50 miles is J K Spruce, a 1,489 MW coal plant 29 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| Vantage TX12 | 8.7 ac | 0.1 mi |
| Vantage TX11 | 2.8 ac | 0.1 mi |
| CyrusOne SAT10 & SAT11 | 4.0 ac | 0.2 mi |
| Microsoft TRP1 | 4.1 ac | 0.8 mi |
| Microsoft Texas Research Park Campus | — | 0.8 mi |
| Microsoft data center, San Antonio | 14 ac | 0.9 mi |
| Microsoft TRP2 | 3.9 ac | 0.9 mi |
| Microsoft TRP3 (SAT46) | 5.2 ac | 1.0 mi |
Data centers in Texas · Data centers in Bexar County · All Vantage Data Centers data centers · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.