34 data centers are mapped in Bexar County, Texas: 60 buildings covering about 116 acres (5,069,000 sq ft) of roof. Operators include Microsoft, CyrusOne, Vantage Data Centers, Amazon Web Services. The county is in EPA's Texas (ERCOT) grid region, whose electricity is 50% natural gas, 23% wind and 13% coal, at 733 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
Data centers in Bexar County draw from the regional grid. In 2023, electricity in EPA's Texas (ERCOT) region was 50% natural gas, 23% wind, 13% coal and 9% nuclear, at 733 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Texas (ERCOT) grid region (ERCT) in 2023, from eGRID. 477 TWh from 749 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| City of San Antonio - (TX) | 10.1¢ | 8.8¢ |
| Pedernales Electric Coop, Inc | 12.8¢ | 6.4¢ |
| Guadalupe Valley Elec Coop Inc | 11.4¢ | 5.4¢ |
| Bandera Electric Coop, Inc | 10.5¢ | 9.0¢ |
| Karnes Electric Coop Inc | 9.2¢ | 6.2¢ |
Utilities that report serving Bexar County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| J K Spruce | Coal | 1,489 MW |
| V H Braunig | Natural Gas | 1,138 MW |
| O W Sommers | Natural Gas | 892 MW |
| Arthur Von Rosenberg | Natural Gas | 575 MW |
| Leon Creek | Natural Gas | 230 MW |
| Ferdinand Energy Center | Battery Storage | 200 MW |
| Padua 2 | Battery Storage | 150 MW |
| Bexar ESS | Battery Storage | 100 MW |
| Padua 1 | Battery Storage | 50.0 MW |
| OCI Alamo Solar I Hybrid | Solar | 40.7 MW |
| Blue Wing Solar Energy Generation | Solar | 13.9 MW |
| SunE CPS3 LLC | Solar | 10.6 MW |
| SunE CPS2 LLC | Solar | 10.0 MW |
| SunE CPS1 LLC | Solar | 10.0 MW |
| Commerce ESS | Other Fossil | 10.0 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.