Data Centers in Bexar County, TX

34 data centers are mapped in Bexar County, Texas: 60 buildings covering about 116 acres (5,069,000 sq ft) of roof. Operators include Microsoft, CyrusOne, Vantage Data Centers, Amazon Web Services. The county is in EPA's Texas (ERCOT) grid region, whose electricity is 50% natural gas, 23% wind and 13% coal, at 733 lb of CO₂ per megawatt-hour.

Sites34mapped data centers
Buildings60mapped footprints
Roof area116 acbuilding footprints
GridERCOTlargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Bexar County

Data centerOperatorCityRoof area
Microsoft data center, San AntonioMicrosoftSan Antonio16 ac
Microsoft data center, San AntonioMicrosoftSan Antonio14 ac
Microsoft San AntonioMicrosoftSan Antonio11 ac
Data center, San AntonioOperator not recordedSan Antonio11 ac
Vantage TX12Vantage Data CentersSan Antonio8.7 ac
Microsoft TRP1MicrosoftSan Antonio4.1 ac
CyrusOne SAT10 & SAT11CyrusOneSan Antonio4.0 ac
Microsoft TRP2MicrosoftSan Antonio3.9 ac
BOperator not recordedSan Antonio3.3 ac
QTS San Antonio IIQuality Technology ServicesSan Antonio3.2 ac
AOperator not recordedSan Antonio2.9 ac
Vantage TX11Vantage Data CentersSan Antonio2.8 ac
Vantage Data Centers TX21Vantage Data CentersSan Antonio2.6 ac
Vantage Data Centers TX22Vantage Data CentersSan Antonio2.6 ac
Amazon AWS SAT - 12807 DonopAmazon Web ServicesElmendorf2.5 ac
CyrusOne San Antonio IICyrusOneSan Antonio2.5 ac
Data center, San AntonioOperator not recordedSan Antonio2.5 ac
AmazonOperator not recordedSan Antonio2.4 ac
CyrusOne San Antonio ICyrusOneSan Antonio2.3 ac
CyrusOne San Antonio IIICyrusOneSan Antonio2.3 ac
Lowe's Data CenterLowe'sSan Antonio2.2 ac
CyrusOne San Antonio IVCyrusOneSan Antonio2.1 ac
Stream San Antonio IIStreamSan Antonio1.6 ac
Frost Bank data center, San AntonioFrost BankSan Antonio1.6 ac
Valero WisermanValeroSan Antonio1.3 ac
CHRISTUS Health data center, San AntonioCHRISTUS HealthSan Antonio1.1 ac
HEB data center, 15103 Huebner Road, San AntonioHEBSan Antonio0.8 ac
ConnectorOperator not recordedSan Antonio0.8 ac
H5 Data Centers San AntonioH5 Data CentersSan Antonio0.5 ac
Lumen San Antonio 2Lumen TechnologiesSan Antonio0.3 ac
GVTC data center, San AntonioGVTCSan Antonio0.0 ac
Texas Cryptologic CenterNational Security AgencySan Antonio—
Microsoft Texas Research Park CampusMicrosoftSan Antonio—
Vantage San Antonio IVantage Data CentersSan Antonio—

What the grid here generates

Data centers in Bexar County draw from the regional grid. In 2023, electricity in EPA's Texas (ERCOT) region was 50% natural gas, 23% wind, 13% coal and 9% nuclear, at 733 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).

Natural Gas 50%Wind 23%Coal 13%Nuclear 9%Solar 6%

Share of electricity generated in EPA's Texas (ERCOT) grid region (ERCT) in 2023, from eGRID. 477 TWh from 749 plants.

Utilities that serve Bexar County

UtilityTypeGridBusiness rateIndustrial rate
City of San Antonio - (TX)MunicipalERCOT10.1¢8.8¢
Pedernales Electric Coop, IncCooperativeERCOT12.8¢6.4¢
Guadalupe Valley Elec Coop IncCooperativeERCOT11.4¢5.4¢
Bandera Electric Coop, IncCooperativeERCOT10.5¢9.0¢
Karnes Electric Coop IncCooperativeERCOT9.2¢6.2¢

Utilities that report serving Bexar County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Bexar County

PlantFuelCapacity
J K SpruceCoal1,489 MW
V H BraunigNatural Gas1,138 MW
O W SommersNatural Gas892 MW
Arthur Von RosenbergNatural Gas575 MW
Leon CreekNatural Gas230 MW
Ferdinand Energy CenterBattery Storage200 MW
Padua 2Battery Storage150 MW
Bexar ESSBattery Storage100 MW
Padua 1Battery Storage50.0 MW
OCI Alamo Solar I HybridSolar40.7 MW
Blue Wing Solar Energy GenerationSolar13.9 MW
SunE CPS3 LLCSolar10.6 MW
SunE CPS2 LLCSolar10.0 MW
SunE CPS1 LLCSolar10.0 MW
Commerce ESSOther Fossil10.0 MW

All power plants in Bexar County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me