Vantage Data Centers TX22

Vantage Data Centers TX22 is a data center in San Antonio, Bexar County, Texas. It is mapped as 1 building covering about 2.6 acres (113,000 sq ft). Its power comes off the Texas (ERCOT) grid (ERCOT), which runs on 50% natural gas, 23% wind and 13% coal.

OperatorVantage Data Centersas mapped
Roof area2.6 ac1 building
Grid CO₂733 lbper MWh, ERCT region
Nearest plant3.1 miHeb_cps00085

Location

This data centerOther data centersPower plants (colored by fuel)

Address5207 Rogers Road, San Antonio TX 78251
CountyBexar County, Texas
Coordinates29.47894, -98.69745
On OpenStreetMapway/1502710557

What powers Vantage Data Centers TX22

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Texas (ERCOT) grid region, and the county's largest utility is on the ERCOT grid. In 2023, the region's electricity was 50% natural gas, 23% wind, 13% coal and 9% nuclear.

Each megawatt-hour carried about 733 lb of CO₂, close to the U.S. grid as a whole (765 lb).

Natural Gas 50%Wind 23%Coal 13%Nuclear 9%Solar 6%

Share of electricity generated in EPA's Texas (ERCOT) grid region (ERCT) in 2023, from eGRID. 477 TWh from 749 plants.

Utilities that serve Bexar County

UtilityTypeGridBusiness rateIndustrial rate
City of San Antonio - (TX)MunicipalERCOT10.1¢8.8¢
Pedernales Electric Coop, IncCooperativeERCOT12.8¢6.4¢
Guadalupe Valley Elec Coop IncCooperativeERCOT11.4¢5.4¢
Bandera Electric Coop, IncCooperativeERCOT10.5¢9.0¢
Karnes Electric Coop IncCooperativeERCOT9.2¢6.2¢

Utilities that report serving Bexar County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Heb_cps00085Natural Gas1.6 MW3.1 mi
Commerce ESSOther Fossil10.0 MW5.7 mi
Commerce SolarSolar5.0 MW5.7 mi
RanchtownOther Fossil9.9 MW9.9 mi
Nelson Gardens Landfill Gas to EnergyBiomass4.4 MW10.5 mi
Leon CreekNatural Gas230 MW11.4 mi
Ferdinand Energy CenterBattery Storage200 MW11.6 mi
Regis Medina LakeBattery Storage9.9 MW17.0 mi
Heb_cps00793Natural Gas1.2 MW17.7 mi
SunE CPS3 LLCSolar10.6 MW17.8 mi

The largest power plant within 50 miles is J K Spruce, a 1,489 MW coal plant 26 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Vantage Data Centers TX21Vantage Data Centers2.6 ac0.1 mi
Microsoft data center, San AntonioMicrosoft16 ac0.2 mi
Microsoft San AntonioMicrosoft11 ac0.3 mi
Lowe's Data CenterLowe's2.2 ac0.6 mi
Frost Bank data center, San AntonioFrost Bank1.6 ac0.8 mi
CHRISTUS Health data center, San AntonioCHRISTUS Health1.1 ac0.9 mi
CyrusOne San Antonio ICyrusOne2.3 ac1.0 mi
Valero WisermanValero1.3 ac1.1 mi
CyrusOne San Antonio IICyrusOne2.5 ac1.6 mi
Stream San Antonio IIStream1.6 ac1.6 mi
CyrusOne San Antonio IIICyrusOne2.3 ac1.6 mi
CyrusOne San Antonio IVCyrusOne2.1 ac1.7 mi
Data center, San AntonioOperator not recorded11 ac2.2 mi
QTS San Antonio IIQuality Technology Services3.2 ac3.4 mi
Data center, San AntonioOperator not recorded2.5 ac4.0 mi

And 5 more within 5 miles.

More

Data centers in Texas · Data centers in Bexar County · All Vantage Data Centers data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me