A

A is a data center in San Antonio, Bexar County, Texas. It is mapped as 1 building covering about 2.9 acres (127,000 sq ft). Its power comes off the Texas (ERCOT) grid (ERCOT), which runs on 50% natural gas, 23% wind and 13% coal.

OperatorOperator not recordedas mapped
Roof area2.9 ac1 building
Grid CO₂733 lbper MWh, ERCT region
Nearest plant1.6 miCommerce ESS

Location

This data centerOther data centersPower plants (colored by fuel)

CountyBexar County, Texas
Coordinates29.44659, -98.64052
On OpenStreetMapway/254742608

What powers A

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Texas (ERCOT) grid region, and the county's largest utility is on the ERCOT grid. In 2023, the region's electricity was 50% natural gas, 23% wind, 13% coal and 9% nuclear.

Each megawatt-hour carried about 733 lb of CO₂, close to the U.S. grid as a whole (765 lb).

Natural Gas 50%Wind 23%Coal 13%Nuclear 9%Solar 6%

Share of electricity generated in EPA's Texas (ERCOT) grid region (ERCT) in 2023, from eGRID. 477 TWh from 749 plants.

Utilities that serve Bexar County

UtilityTypeGridBusiness rateIndustrial rate
City of San Antonio - (TX)MunicipalERCOT10.1¢8.8¢
Pedernales Electric Coop, IncCooperativeERCOT12.8¢6.4¢
Guadalupe Valley Elec Coop IncCooperativeERCOT11.4¢5.4¢
Bandera Electric Coop, IncCooperativeERCOT10.5¢9.0¢
Karnes Electric Coop IncCooperativeERCOT9.2¢6.2¢

Utilities that report serving Bexar County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Commerce ESSOther Fossil10.0 MW1.6 mi
Commerce SolarSolar5.0 MW1.6 mi
Heb_cps00085Natural Gas1.6 MW3.9 mi
Leon CreekNatural Gas230 MW7.6 mi
Ferdinand Energy CenterBattery Storage200 MW7.8 mi
Nelson Gardens Landfill Gas to EnergyBiomass4.4 MW8.1 mi
RanchtownOther Fossil9.9 MW13.2 mi
SunE CPS3 LLCSolar10.6 MW15.6 mi
Bexar ESSBattery Storage100 MW16.4 mi
OCI Alamo Solar I HybridSolar40.7 MW16.9 mi

The largest power plant within 50 miles is J K Spruce, a 1,489 MW coal plant 21 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Texas Cryptologic CenterNational Security Agency—0.0 mi
ConnectorOperator not recorded0.8 ac0.1 mi
BOperator not recorded3.3 ac0.1 mi
Data center, San AntonioOperator not recorded2.5 ac0.3 mi
AmazonOperator not recorded2.4 ac0.3 mi
QTS San Antonio IIQuality Technology Services3.2 ac0.8 mi
CyrusOne San Antonio IVCyrusOne2.1 ac2.5 mi
CyrusOne San Antonio IIICyrusOne2.3 ac2.5 mi
CyrusOne San Antonio IICyrusOne2.5 ac2.6 mi
Stream San Antonio IIStream1.6 ac2.6 mi
Valero WisermanValero1.3 ac3.0 mi
CyrusOne San Antonio ICyrusOne2.3 ac3.2 mi
CHRISTUS Health data center, San AntonioCHRISTUS Health1.1 ac3.2 mi
Frost Bank data center, San AntonioFrost Bank1.6 ac3.3 mi
Lowe's Data CenterLowe's2.2 ac3.5 mi

And 5 more within 5 miles.

More

Data centers in Texas · Data centers in Bexar County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me