CyrusOne SAT10 & SAT11

CyrusOne SAT10 & SAT11 is a data center in San Antonio, Bexar County, Texas. It is mapped as 2 buildings covering about 4.0 acres (173,000 sq ft). Its power comes off the Texas (ERCOT) grid (ERCOT), which runs on 50% natural gas, 23% wind and 13% coal.

OperatorCyrusOneas mapped
Roof area4.0 ac2 buildings
Grid CO₂733 lbper MWh, ERCT region
Nearest plant5.2 miHeb_cps00085

Location

This data centerOther data centersPower plants (colored by fuel)

CountyBexar County, Texas
Coordinates29.41875, -98.78789
On OpenStreetMapway/1344366214, way/1010260674, way/1344369111

What powers CyrusOne SAT10 & SAT11

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Texas (ERCOT) grid region, and the county's largest utility is on the ERCOT grid. In 2023, the region's electricity was 50% natural gas, 23% wind, 13% coal and 9% nuclear.

Each megawatt-hour carried about 733 lb of CO₂, close to the U.S. grid as a whole (765 lb).

Natural Gas 50%Wind 23%Coal 13%Nuclear 9%Solar 6%

Share of electricity generated in EPA's Texas (ERCOT) grid region (ERCT) in 2023, from eGRID. 477 TWh from 749 plants.

Utilities that serve Bexar County

UtilityTypeGridBusiness rateIndustrial rate
City of San Antonio - (TX)MunicipalERCOT10.1¢8.8¢
Pedernales Electric Coop, IncCooperativeERCOT12.8¢6.4¢
Guadalupe Valley Elec Coop IncCooperativeERCOT11.4¢5.4¢
Bandera Electric Coop, IncCooperativeERCOT10.5¢9.0¢
Karnes Electric Coop IncCooperativeERCOT9.2¢6.2¢

Utilities that report serving Bexar County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Heb_cps00085Natural Gas1.6 MW5.2 mi
Nelson Gardens Landfill Gas to EnergyBiomass4.4 MW9.8 mi
Commerce ESSOther Fossil10.0 MW10.3 mi
Commerce SolarSolar5.0 MW10.3 mi
Leon CreekNatural Gas230 MW13.6 mi
Ferdinand Energy CenterBattery Storage200 MW13.6 mi
RanchtownOther Fossil9.9 MW14.1 mi
SunE CPS3 LLCSolar10.6 MW15.4 mi
Regis Medina LakeBattery Storage9.9 MW16.1 mi
Bexar ESSBattery Storage100 MW22.4 mi

The largest power plant within 50 miles is J K Spruce, a 1,489 MW coal plant 29 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Vantage TX11Vantage Data Centers2.8 ac0.2 mi
Vantage TX12Vantage Data Centers8.7 ac0.2 mi
Vantage San Antonio IVantage Data Centers—0.2 mi
Microsoft Texas Research Park CampusMicrosoft—0.9 mi
Microsoft data center, San AntonioMicrosoft14 ac1.0 mi
Microsoft TRP1Microsoft4.1 ac1.0 mi
Microsoft TRP2Microsoft3.9 ac1.1 mi
Microsoft TRP3 (SAT46)Microsoft5.2 ac1.2 mi
Data center, San AntonioOperator not recorded11 ac4.9 mi

More

Data centers in Texas · Data centers in Bexar County · All CyrusOne data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me