Stream Data Centers

7 Stream data centers are mapped in the U.S. on OpenStreetMap, in 4 states: 7 buildings covering about 24.1 acres (1,048,000 sq ft) of roof. Weighted by building size, the grids they sit on average 793 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).

Sites7mapped
States4with a site
Buildings7mapped footprints
Roof area24 acbuilding footprints

Map of Stream data centers

Data centerUnder construction

By grid region

Grid regionSitesCO₂ lb/MWhLargest sources
Texas (ERCOT)373350% natural gas, 23% wind and 13% coal
Ohio Valley291138% natural gas, 28% nuclear and 25% coal
Southwest (Arizona/New Mexico)170349% natural gas, 18% nuclear and 11% coal
Upper Midwest192038% wind, 35% coal and 13% natural gas

Every mapped site

Data centerPlaceGrid regionRoof area
Stream Data Centers PHX-1Goodyear, ArizonaSouthwest (Arizona/New Mexico)9.4 ac
Stream Chicago IIElk Grove Village, IllinoisOhio Valley4.9 ac
Stream Chicago IElk Grove Village, IllinoisOhio Valley3.3 ac
StreamData CenterChaska, MinnesotaUpper Midwest1.5 ac
Stream Data Centers HoustonThe Woodlands, TexasTexas (ERCOT)2.9 ac
Stream San Antonio IISan Antonio, TexasTexas (ERCOT)1.6 ac
Stream DFW IVRichardson, TexasTexas (ERCOT)0.4 ac

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.