Stream Data Centers Houston

Stream Data Centers Houston is a data center in The Woodlands, Montgomery County, Texas. It is mapped as 1 building covering about 2.9 acres (126,000 sq ft). Its power comes off the Texas (ERCOT) grid (MISO (Midcontinent ISO)), which runs on 50% natural gas, 23% wind and 13% coal.

OperatorStreamas mapped
Roof area2.9 ac1 building
Grid CO₂733 lbper MWh, ERCT region
Nearest plant3.1 miHeb00594

Location

This data centerOther data centersPower plants (colored by fuel)

Address4001 Technology Forest Boulevard, The Woodlands TX 77381
CountyMontgomery County, Texas
Coordinates30.17788, -95.48645
Websitewww.streamdatacenters.com/datacenters/houston-the-woodlands/
On OpenStreetMapnode/9190480200, way/744177375

What powers Stream Data Centers Houston

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Texas (ERCOT) grid region, and the county's largest utility is on the MISO (Midcontinent ISO) grid. In 2023, the region's electricity was 50% natural gas, 23% wind, 13% coal and 9% nuclear.

Each megawatt-hour carried about 733 lb of CO₂, close to the U.S. grid as a whole (765 lb).

Natural Gas 50%Wind 23%Coal 13%Nuclear 9%Solar 6%

Share of electricity generated in EPA's Texas (ERCOT) grid region (ERCT) in 2023, from eGRID. 477 TWh from 749 plants.

Utilities that serve Montgomery County

UtilityTypeGridBusiness rateIndustrial rate
Entergy Texas Inc.Investor OwnedMISO (Midcontinent ISO)9.6¢5.9¢
Sam Houston Electric Coop IncCooperativeMISO (Midcontinent ISO)12.7¢9.0¢
Mid-South Electric Coop AssnCooperativeERCOT14.4¢9.0¢
San Bernard Electric Coop, IncCooperativeERCOT11.3¢8.9¢

Utilities that report serving Montgomery County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Heb00594Natural Gas1.2 MW3.1 mi
Wal602Natural Gas1.2 MW4.1 mi
Wal3390Natural Gas1.2 MW6.2 mi
Wal5287Natural Gas1.2 MW7.1 mi
Wal849Natural Gas1.2 MW8.5 mi
Heb00767Natural Gas1.2 MW12.1 mi
Wal1103Natural Gas1.2 MW12.4 mi
Wal5045Natural Gas1.2 MW13.0 mi
Heb00099Natural Gas1.2 MW13.7 mi
Regis Gears HarrisBattery Storage9.9 MW15.1 mi

The largest power plant within 50 miles is W A Parish, a 4,008 MW coal plant 49 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

More

Data centers in Texas · All Stream data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me