Aligned Data Centers

10 Aligned data centers are mapped in the U.S. on OpenStreetMap, in 4 states: 11 buildings covering about 44.0 acres (1,917,000 sq ft) of roof. Weighted by building size, the grids they sit on average 731 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).

Sites10mapped
States4with a site
Buildings11mapped footprints
Roof area44 acbuilding footprints

Map of Aligned data centers

Data centerUnder construction

By grid region

Grid regionSitesCO₂ lb/MWhLargest sources
Mid-Atlantic459454% natural gas, 36% nuclear and 5% coal
Ohio Valley391138% natural gas, 28% nuclear and 25% coal
Texas (ERCOT)273350% natural gas, 23% wind and 13% coal
Southwest (Arizona/New Mexico)170349% natural gas, 18% nuclear and 11% coal

Every mapped site

Data centerPlaceGrid regionRoof area
Aligned Energy Data CenterPhoenix, ArizonaSouthwest (Arizona/New Mexico)12 ac
Aligned Data CenterElk Grove Village, IllinoisOhio Valley5.9 ac
Aligned Data Center - Chicago ORD-01Northlake, IllinoisOhio Valley4.4 ac
Aligned Data Center - Chicago ORD-02Northlake, IllinoisOhio Valley2.6 ac
Aligned DFW-01Plano, TexasTexas (ERCOT)2.5 ac
Aligned DFW-02Plano, TexasTexas (ERCOT)2.0 ac
Aligned IAD-02Ashburn, VirginiaMid-Atlantic4.8 ac
IADAshburn, VirginiaMid-Atlantic4.2 ac
Aligned IAD-01Ashburn, VirginiaMid-Atlantic3.2 ac
Aligned IAD-03Sterling, VirginiaMid-Atlantic2.6 ac

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.