Centersquare Data Centers

16 Centersquare data centers are mapped in the U.S. on OpenStreetMap, in 7 states: 17 buildings covering about 47.3 acres (2,061,000 sq ft) of roof. Weighted by building size, the grids they sit on average 730 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).

Sites16mapped
States7with a site
Buildings17mapped footprints
Roof area47 acbuilding footprints

Map of Centersquare data centers

Data centerUnder construction

By grid region

Grid regionSitesCO₂ lb/MWhLargest sources
Mid-Atlantic959454% natural gas, 36% nuclear and 5% coal
Ohio Valley391138% natural gas, 28% nuclear and 25% coal
Southeast184055% natural gas, 20% nuclear and 15% coal
Texas (ERCOT)173350% natural gas, 23% wind and 13% coal
Northwest163139% hydroelectric, 25% natural gas and 16% coal
Southwest (Arizona/New Mexico)170349% natural gas, 18% nuclear and 11% coal

Every mapped site

Data centerPlaceGrid regionRoof area
Centersquare: Phoenix - (PHX1 - Mesa)Mesa, ArizonaSouthwest (Arizona/New Mexico)1.3 ac
Centersquare Atlanta ATL1Lithia Springs, GeorgiaSoutheast5.7 ac
Centersquare Lisle ORD4 Data CenterLisle, IllinoisOhio Valley8.2 ac
Centersquare Elk Grove Village Data Center Campus ORD2Elk Grove Village, IllinoisOhio Valley4.5 ac
Centersquare Chicago Data Center - ORD1Chicago, IllinoisOhio Valley—
Centersquare NYC3 Data CenterSecaucus, New JerseyMid-Atlantic3.3 ac
Evoque Allen DA1Allen, TexasTexas (ERCOT)5.4 ac
Centersquare IAD1-CSterling, VirginiaMid-Atlantic3.1 ac
Centersquare IAD3Dulles, VirginiaMid-Atlantic3.0 ac
Centersquare IAD4-BAshburn, VirginiaMid-Atlantic2.1 ac
Centersquare IAD1-ASterling, VirginiaMid-Atlantic2.1 ac
Centersquare IAD1-BSterling, VirginiaMid-Atlantic1.8 ac
Centersquare IAD4-AAshburn, VirginiaMid-Atlantic1.8 ac
Centersquare IAD2-BSterling, VirginiaMid-Atlantic1.6 ac
Centersquare IAD2-ASterling, VirginiaMid-Atlantic1.1 ac
Centersquare Lynnwood SE1Lynnwood, WashingtonNorthwest2.4 ac

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.