Centersquare Chicago Data Center - ORD1

Centersquare Chicago Data Center - ORD1 is a data center in Chicago, Cook County, Illinois. Its power comes off the Ohio Valley grid (PJM Interconnection), which runs on 38% natural gas, 28% nuclear and 25% coal.

OperatorCentersquareas mapped
Grid CO₂911 lbper MWh, RFCW region
Nearest plant0.1 miMPEA Energy Center

Location

This data centerOther data centersPower plants (colored by fuel)

Address350 East Cermak Road, Chicago IL 60616
CountyCook County, Illinois
Coordinates41.85338, -87.61861
Websitecentersquaredc.com/data-centers/chicago#chicagocermak-ord1
On OpenStreetMapnode/10910879065

What powers Centersquare Chicago Data Center - ORD1

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Ohio Valley grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 38% natural gas, 28% nuclear, 25% coal and 5% wind.

Each megawatt-hour carried about 911 lb of CO₂, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Natural Gas 38%Nuclear 28%Coal 25%Wind 5%

Share of electricity generated in EPA's Ohio Valley grid region (RFCW) in 2023, from eGRID. 524 TWh from 824 plants.

Utilities that serve Cook County

UtilityTypeGridBusiness rateIndustrial rate
Commonwealth Edison CoInvestor OwnedPJM Interconnection12.3¢7.4¢

Utilities that report serving Cook County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
MPEA Energy CenterOil6.0 MW0.1 mi
Fisk StreetOil260 MW1.8 mi
University of Illinois Cogen FacilityNatural Gas59.9 MW2.0 mi
Esil-Pfchicago 3, LLCSolar1.4 MW2.6 mi
Chicago West Side Energy CenterNatural Gas3.5 MW3.3 mi
IL Chicago 2635 S Western Ave. (West)Solar1.8 MW3.4 mi
Museum of Science and IndustryNatural Gas1.7 MW4.7 mi
Presence Saint Mary of Nazareth HospitalOil5.0 MW4.8 mi
S-Pulaski SolarSolar2.0 MW5.5 mi
Esil-Pfchicago 2, LLCSolar1.0 MW6.5 mi

The largest power plant within 50 miles is Dresden Generating Station, a 2,019 MW nuclear plant 46 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Digital Realty ORD10Digital Realty—0.0 mi
Lakeside Technology CenterOperator not recorded2.9 ac0.0 mi
Equinix Chicago Data Center - CH1Equinix—0.0 mi
CoreSite Chicago Data Center (CH2)CoreSite1.4 ac1.3 mi
Iron Mountain Data & Record StorageIron Mountain2.4 ac1.4 mi
Netrality data center, ChicagoNetrality—1.5 mi
Digital Realty ORD11Digital Realty0.2 ac1.6 mi
Serverfarm CH1Serverfarm1.3 ac1.6 mi
CoreSite Chicago Data Center (CH1)CoreSite—1.7 mi
West MonroeOperator not recorded—2.1 mi
QTS ChicagoQuality Technology Services6.5 ac2.7 mi

More

Data centers in Illinois · Data centers in Cook County · All Centersquare data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me