Data Centers in Illinois

61 data centers mapped in Illinois: 64 buildings covering about 223 acres of roof. The most are in Cook County (35). Most sit in EPA's Ohio Valley grid region, whose electricity is 38% natural gas, 28% nuclear and 25% coal, at 911 lb of CO₂ per megawatt-hour, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Sites61mapped data centers
Buildings64mapped footprints
Roof area223 acbuilding footprints
Counties6with a data center

Map of data centers in Illinois

Data centerUnder construction

What powers Illinois's data centers

A data center draws from its regional grid, not from one plant. These are the grid regions Illinois's data centers sit in, and what those regions generate:

Ohio Valley · 59 sites

911 lb CO₂ per MWh, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Natural Gas 38%Nuclear 28%Coal 25%Wind 5%

Share of electricity generated in EPA's Ohio Valley grid region (RFCW) in 2023, from eGRID. 524 TWh from 824 plants.

Mid-Mississippi · 2 sites

1,238 lb CO₂ per MWh, 62% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Coal 51%Natural Gas 17%Nuclear 16%Wind 13%

Share of electricity generated in EPA's Mid-Mississippi grid region (SRMW) in 2023, from eGRID. 106 TWh from 243 plants.

All power plants in Illinois →

By county

Operators

Digital Realty (6) · CyrusOne (5) · Microsoft (4) · NTT (4) · Aligned (3) · Centersquare (3) · EdgeConneX (3) · Equinix (3) · Meta (3) · CoreSite (2) · Edged (2) · Element Critical (2) · Stream (2) · Iron Mountain (1) · NCSA (1) · NetSource (1) · Netrality (1) · Prime (1) · Quality Technology Services (1) · Serverfarm (1)

Every mapped data center in Illinois

Data centerOperatorCity · CountyRoof area
Edged Chicago ORD01-02EdgedAurora · DuPage16 ac
Meta data center, DekalbMetaDekalb · DeKalb13 ac
Meta data center, DekalbMetaDekalb · DeKalb13 ac
Digital Realty CH1Digital RealtyElk Grove Village · Cook11 ac
Centersquare Lisle ORD4 Data CenterCentersquareLisle · DuPage8.2 ac
Digital Realty CH3Digital RealtyElk Grove Village · Cook7.9 ac
Meta data center, DekalbMetaDekalb · DeKalb7.3 ac
Microsoft - Azure DatacenterMicrosoftNorthlake · Cook7.0 ac
STACK Chicago CHI01Stack InfrastructureElk Grove Village · Cook7.0 ac
Digital Realty CH2Digital RealtyElk Grove Village · Cook6.9 ac
QTS ChicagoQuality Technology ServicesChicago · Cook6.5 ac
CHI1CyrusOneAurora · DuPage6.3 ac
EdgeConneX Data Center under constructionEdgeConneXElk Grove Village · Cook5.9 ac
Aligned Data CenterAlignedElk Grove Village · Cook5.9 ac
Prime Data CentersPrimeElk Grove Village · Cook5.1 ac
CHI2CyrusOneAurora · DuPage4.9 ac
Stream Chicago IIStreamElk Grove Village · Cook4.9 ac
CyrusOne CHI9CyrusOneAurora · DuPage4.9 ac
Centersquare Elk Grove Village Data Center Campus ORD2CentersquareElk Grove Village · DuPage4.5 ac
Aligned Data Center - Chicago ORD-01AlignedNorthlake · Cook4.4 ac
Skybox Chicago ISkyboxElk Grove Village · Cook4.0 ac
CHI3CyrusOneAurora · DuPage3.9 ac
Equinix Chicago CH3EquinixElk Grove Village · Cook3.8 ac
Stream Data Centers data center, Elk Grove Village under constructionStream Data CentersElk Grove Village · Cook3.7 ac
T5 Chicago II Data CenterT5 Data CentersElk Grove Village · Cook3.7 ac
Microsoft CHI12 Data CenterMicrosoftElk Grove Village · Cook3.4 ac
Microsoft CHI13 Data Center under constructionMicrosoftElk Grove Village · Cook3.4 ac
Stream Chicago IStreamElk Grove Village · Cook3.3 ac
Lakeside Technology CenterOperator not recordedChicago · Cook2.9 ac
EdgeConneX CHI01EdgeConneXElk Grove Village · Cook2.7 ac
Edged Chicago ORD01-01EdgedAurora · DuPage2.7 ac
NTT Chicago CH2NTTItasca · DuPage2.6 ac
Aligned Data Center - Chicago ORD-02AlignedNorthlake · Cook2.6 ac
NTT Chicago CH1NTTItasca · DuPage2.6 ac
Microsoft CHI11 Data CenterMicrosoftElk Grove Village · Cook2.4 ac
Iron Mountain Data & Record StorageIron MountainChicago · Cook2.4 ac
NTT Chicago CH4NTTItasca · DuPage2.3 ac
Element Critical CH1Element CriticalWood Dale · DuPage2.1 ac
Digital Realty Chicago ORD12Digital RealtyFranklin Park · Cook2.1 ac
NTT Chicago CH3NTTItasca · DuPage1.9 ac
Lincoln RackhouseOperator not recordedEola · DuPage1.6 ac
Data center, Melrose ParkOperator not recordedMelrose Park · Cook1.6 ac
EdgeConneX CHI02EdgeConneXElk Grove Village · Cook1.5 ac
CoreSite Chicago Data Center (CH2)CoreSiteChicago · Cook1.4 ac
Serverfarm CH1ServerfarmChicago · Cook1.3 ac
VISA data center, Vernon HillsVISAVernon Hills · Lake1.3 ac
CyrusOne CHI6CyrusOneWood Dale · DuPage1.2 ac
Equinix Chicago Data CH7EquinixClarendon Hills · DuPage1.1 ac
NCSA Petascale Computing FacilityNCSAChampaign · Champaign1.0 ac
Element Critical CH2Element CriticalWood Dale · DuPage1.0 ac
NetSource Communications, IncNetSourceNaperville · DuPage0.4 ac
Data center, 1215 Carolina Drive, West ChicagoOperator not recordedWest Chicago · DuPage0.3 ac
Datacenter (386)UChicago Argonne LLCLemont · DuPage0.3 ac
Digital Realty ORD11Digital RealtyChicago · Cook0.2 ac
Data center, EdwardsvilleOperator not recordedEdwardsville · Madison0.0 ac
Netrality data center, ChicagoNetralityChicago · Cook—
Digital Realty ORD10Digital RealtyChicago · Cook—
Centersquare Chicago Data Center - ORD1CentersquareChicago · Cook—
West MonroeOperator not recordedChicago · Cook—
CoreSite Chicago Data Center (CH1)CoreSiteChicago · Cook—
Equinix Chicago Data Center - CH1EquinixChicago · Cook—

3 sites are tagged as under construction.

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.