Microsoft - Azure Datacenter is a data center in Northlake, Cook County, Illinois. It is mapped as 1 building covering about 7.0 acres (305,000 sq ft). Its power comes off the Ohio Valley grid (PJM Interconnection), which runs on 38% natural gas, 28% nuclear and 25% coal.
This data centerOther data centersPower plants (colored by fuel)
| Address | 601 Northwest Avenue, Northlake IL 60164 |
|---|---|
| County | Cook County, Illinois |
| Coordinates | 41.92326, -87.91854 |
| On OpenStreetMap | way/578443547 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Ohio Valley grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 38% natural gas, 28% nuclear, 25% coal and 5% wind.
Each megawatt-hour carried about 911 lb of CO₂, 19% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Ohio Valley grid region (RFCW) in 2023, from eGRID. 524 TWh from 824 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Commonwealth Edison Co | 12.3¢ | 7.4¢ |
Utilities that report serving Cook County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Northlake 3-SLCHI303 | Solar | 1.6 MW | 0.6 mi |
| Copenhagen Ct | Solar | 3.5 MW | 1.1 mi |
| 10701 Seymour Ave East 1 CSG | Solar | 2.9 MW | 2.1 mi |
| 10601 Seymour Ave East 2 CSG | Solar | 2.0 MW | 2.2 mi |
| Albertsons at Melrose Park | Solar | 1.9 MW | 3.2 mi |
| Franklin Park 3-SLCHI803 | Solar | 1.2 MW | 3.4 mi |
| 2065 George St Community Solar | Solar | 3.2 MW | 3.7 mi |
| Triton East and West Cogen | Natural Gas | 3.6 MW | 3.8 mi |
| Loyola University Health Plant | Natural Gas | 10.6 MW | 6.3 mi |
| MTHS Co-Gen Buildings | Natural Gas | 1.2 MW | 6.4 mi |
The largest power plant within 50 miles is Braidwood Generation Station, a 2,450 MW nuclear plant 50 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| Aligned Data Center - Chicago ORD-01 | 4.4 ac | 0.6 mi |
| Aligned Data Center - Chicago ORD-02 | 2.6 ac | 0.7 mi |
| Data center, Melrose Park | 1.6 ac | 0.8 mi |
| Digital Realty Chicago ORD12 | 2.1 ac | 3.1 mi |
| Element Critical CH2 | 1.0 ac | 4.3 mi |
| Element Critical CH1 | 2.1 ac | 4.3 mi |
| CyrusOne CHI6 | 1.2 ac | 4.4 mi |
Data centers in Illinois · Data centers in Cook County · All Microsoft data centers · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.