41 Microsoft data centers are mapped in the U.S. on OpenStreetMap, in 10 states: 77 buildings covering about 306 acres (13,344,000 sq ft) of roof. Weighted by building size, the grids they sit on average 776 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).
Data centerUnder construction
| Grid region | Sites | CO₂ lb/MWh |
|---|---|---|
| Texas (ERCOT) | 10 | 733 |
| Virginia/Carolinas | 7 | 590 |
| Southwest (Arizona/New Mexico) | 5 | 703 |
| Upper Midwest | 4 | 920 |
| Ohio Valley | 4 | 911 |
| Northwest | 4 | 631 |
| Southeast | 3 | 840 |
| Rocky Mountains | 2 | 1,036 |
| California | 1 | 426 |
| Puerto Rico | 1 | 1,543 |
| Data center | Place | Roof area |
|---|---|---|
| PHX-11 | Goodyear, Arizona | 5.7 ac |
| PHX-12 | Goodyear, Arizona | 5.6 ac |
| PHX-13 | Goodyear, Arizona | 5.6 ac |
| PHX-14 | Goodyear, Arizona | 5.6 ac |
| PHX-10 | Goodyear, Arizona | 5.6 ac |
| Microsoft data center, Santa Clara | Santa Clara, California | 3.8 ac |
| Douglasville | Lithia Springs, Georgia | 12 ac |
| Microsoft data center, Red Oak | Red Oak, Georgia | 5.7 ac |
| Microsoft data center, Atlanta | Atlanta, Georgia | 0.7 ac |
| Microsoft data center, Cumming | Cumming, Iowa | 28 ac |
| Microsoft data center, Des Moines | Des Moines, Iowa | 27 ac |
| Microsoft data center, Booneville | Booneville, Iowa | 23 ac |
| Microsoft data center, West Des Moines | West Des Moines, Iowa | 9.8 ac |
| Microsoft - Azure Datacenter | Northlake, Illinois | 7.0 ac |
| Microsoft CHI12 Data Center | Elk Grove Village, Illinois | 3.4 ac |
| Microsoft CHI13 Data Center under construction | Elk Grove Village, Illinois | 3.4 ac |
| Microsoft CHI11 Data Center | Elk Grove Village, Illinois | 2.4 ac |
| Microsoft data center, Guaynabo | Guaynabo, Puerto Rico | — |
| Microsoft data center, San Antonio | San Antonio, Texas | 16 ac |
| Microsoft data center, San Antonio | San Antonio, Texas | 14 ac |
| Microsoft San Antonio | San Antonio, Texas | 11 ac |
| Microsoft SAT 81 | San Antonio, Texas | 5.6 ac |
| Microsoft SAT 82 | San Antonio, Texas | 5.6 ac |
| Microsoft SAT 80 | San Antonio, Texas | 5.6 ac |
| Microsoft TRP3 (SAT46) | San Antonio, Texas | 5.2 ac |
| Microsoft TRP1 | San Antonio, Texas | 4.1 ac |
| Microsoft TRP2 | San Antonio, Texas | 3.9 ac |
| Microsoft Texas Research Park Campus | San Antonio, Texas | — |
| Microsoft IAD11 | Aldie, Virginia | 10 ac |
| Microsoft Leesburg Building 4 | Leesburg, Virginia | 5.6 ac |
| Microsoft Leesburg Building 3 | Leesburg, Virginia | 5.5 ac |
| Microsoft Leesburg Building 1 | Leesburg, Virginia | 3.5 ac |
| Microsoft Leesburg Building 5 | Leesburg, Virginia | 3.5 ac |
| Microsoft Leesburg Building 2 | Leesburg, Virginia | 2.2 ac |
| Microsoft data center, Aldie | Aldie, Virginia | — |
| Microsoft data center, Quincy | Quincy, Washington | 26 ac |
| Microsoft EAT02 | East Wenatchee, Washington | 5.6 ac |
| Microsoft EAT03 | East Wenatchee, Washington | 5.4 ac |
| Microsoft EAT04 under construction | East Wenatchee, Washington | 5.4 ac |
| CYS41 Datacenter | Fe Warren Afb, Wyoming | 6.9 ac |
| CYS42 Datacenter | Fe Warren Afb, Wyoming | 2.0 ac |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.